Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"
Sustainability Reporting - Guidelines for Sustainability Reporting based on reporting processes of VA Technologie and Österreichische Bundesforste
Scientific attendance of sustainability reporting processes in two partner enterprises (VA Tech and ÖBf AG). Development of the guideline "Reporting about Sustainability" based on these practical experiences.
Integration methods for solar heat into industrial production processes
The project aims at the development of integration methods for solar heat into industrial production process with batch operations as typical for SMEs
New potentials using hardwood with small diameters in forestry and timber industry
Identification of potentials to use hardwood with small diameters (SDH) in Austria with the help of the value added chain from the forest's location to the processor. Analysis and evaluation of availability, quality and market potential.
"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.
Itz Smart – Carbon neutral city district development Itzling – Implementing innovation and technology via co-operative process design
The goal of the project “Itz Smart” is to tie in with existing activities and to consistently develop Itzling as a residential location further. In the test and demonstration area, sustainable residential quarters with trendsetting solutions for mobility are developed in the zone of the transport axis (railway and Schillerstraße) and along the local supply axis (Itzlinger Hauptstraße). The consideration of housing and mobility with regard to the aspect of “city of short ways“ also entails a discussion of determined mixed utilisation and the development of such residential quarters.
Energy Services as an Integral Part of the Distribution
Concept development for the implementation of efficient energy services as part of grid connected energy supply to increase energy end-use efficiency.
AIA4ALL - development of open, modular and automatable employer’s information requirements (EIR) and BIM execution plan (BEP)
The Employer's Information Requirements - EIR (German: AIA) - serves the client to define goals and use cases for a BIM-based construction project. The aim of this project is to create a modular, machine-readable AIA that can be seamlessly integrated into the tool landscape of openBIM projects. This is done by developing an open platform for creating use cases for the AIA.
Bregenz 2040 climate neutrality roadmap focussing on the electricity and heating transition, mobility and public acceptance
The central goal of the project is to create a consistent, comprehensive, and feasible roadmap to achieve climate neutrality in Bregenz by 2040.
Wastewater cycle. Cascadic recycling of wastewater and organic residue streams in buildings.
Basic research is being conducted for a sustainable cycle-oriented system for the building-integrated recycling of wastewater and food waste. This includes nutrient recovery for a sustainable circulation system (production of plant fertiliser and biochar), electricity production to meet the demand (up to 15 %) of plus-energy buildings, as well as water recovery for irrigation of the building's own or urban greenery and for summer cooling.
KLIMADEMO VIS-A-VIS: Participatory realization of a climate-neutral demonstration building Vis-à-Vis
Participatory development of a pilot project at the interface between climate neutrality, affordability and multi-storey wooden housing based on well-founded decision-making bases in terms of renewable materials and renewable energies. The result is a multipliable carbon neutral building and the dissemination of carbon neutrality know-how to a larger audience.
StromBIZ - demonstration projects: business models for decentralized electricity generation and distribution
Feasible business models to utilize locally generated renewable energy are expected to induce a tipping point for the "Energy Turnaround" in Austria. Within the proposed project a number of demonstration PV plants on residential and non-residential buildings had been realized. On this basis new approaches of business cases had been developed, implemented, tested and disseminated.
BIMBestand - BIM-based management of existing buildings
The objective of this research project is to develop information requirements and process descriptions for the application of BIM models related to building services in facility management and to demonstrate the lifecycle-oriented use of these models in an open BIM environment. For this purpose, software solutions for the use of IFC in the open-source platform SIMULTAN and building management software are developed and evaluated on the basis of four typical use cases.
Offices in times of climate change
Study about the impact of climate change on the thermal comfort in office buildings. Special attention is paid to the users´ behaviour. Basic information for the development of detailed strategies for adjustments by the real estate industry and by politics, who are actively involved into the project by participating in start and result workshops.
Office Building WKS - Plus Energy Office Building in Ernstbrunn
The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.
Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings
The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.
Ozon as service
Developement of a concept of "service ozone as a special gas" has the main reason to support the chemical industrie, laboratories and others to substitute chemical oxidatives, which is a big ökological advantage.
Active operation of electrical distribution networks with high share of decentralised power generation
Conceptual design, preparation and development networks areas with active grid operation and a high share of distributed generation. Create the premises for the implementation of innovative demonstration networks by involving of all relevant players.
Study of the Potential of Popcorn-Technologies for the Austrian Energy System
OWA+Quartier - Sustainable refurbishment and energy supply for the historic Otto-Wagner-Areal towards a plus-energy district
Development of thermal and electrical energy supply for the Otto-Wagner-Areal as well as model solutions for construction and building services in order to initiate the redevelopment of the area in the direction of a plus-energy district.
Urban MoVe - Private law contracts as innovative instruments for city and mobility planning.
The research project Urban MoVe investigated to what extent private-law contracts (e.g. mobility contracts, funds, urban development contracts) are suitable as municipal planning and steering instruments for mobility at residential locations based on best practice analyzes and implemented national practical examples.