Search results

There are 41 results.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 1: lead project management

The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management

Haus der Zukunft

"gugler! build & print triple zero" - subproject 2: building with recycros

Building with recycros is working out basics in order to close the cycle of materials in the building sector as well as to increase the usage of recycled materials (recycros). The existing material cycles in the building sector are going to be analysed. Furthermore, there will be a catalogue presented, covering the actual situation of which materials are used in today´s engineering and how the waste is treated. The project will be completed with a summary of results and a proposal of concrete materials and constructional systems for the building project gugler.

Haus der Zukunft

ABC - DisposaL - Assessment of Building and Construction - Disposal LCA Indicators for the disposal performance of construction

A framework of assessment for the disposal of building materials, constructions and buildings will be developed. The results will be included in the OI3-indicator and in the building assessment tool Total Quality Building. Demonstration projects of the programme Building of Tomorrow will be assessed with the new method.

Haus der Zukunft

AGelFa - Development of surface structurable final-coating stucco systems on high-performance heat-insulating aerogel insulation plaster for historic building facades.

High-performance insulating plaster systems represent an important option toward improving the thermal insulation of historic buildings without changing their physical appearance. The high-performance aerogel insulation plaster has recently become available for deployment. In this context, the present will explore final stucco systems suitable for building with structured surfaces.

Haus der Zukunft

Active know-how-transfer sustainable building with renewable raw materials - lecture in theory and practice at the Technical University of Vienna

Lecture "Sustainable Building with Renewable Resources" focusing on theoretical and practical knowledge of straw bale building and including relevant research results of "Building of Tomorrow "

Haus der Zukunft

Alternative insulation made from modified lignocellulosic fibers

Wood as the raw material for a new insulation material

Haus der Zukunft

BIMaterial Process Design for Material Building Pass

Building Information Modelling supported compilation of a Material Building Pass; as a qualitative and quantitative documentation of the material composition of, and the material distribution within, a building structure. This project is a central milestone towards standardized, BIM-generated building material passes.

Haus der Zukunft

Basic research on the load bearing capacity and high thermal insulation properties of foam glass granulate

The aim of the scientific investigations is to find the characteristic parameters of foam glass granulate applied as load transfer layer and thermal insulation, to provide the base for the application of a multi functional and economical insulation material at the interface between building and ground for buildings of the future.

Haus der Zukunft

Beacon of innovation gugler cross media, ecoeffective zero energy cross media enterprise featuring zero-emission, zero energy, zero waste

The aim of the flagship project is a new dimension of sustainability (cradle to cradle, ecoeffective zero energy enterprise) for business operation and building, which means zero emission, zero energy, zero waste. This will be shown on the basis of a beacon of innovation: Gugler GmbH, a modern sustainable media services enterprise (traditional print and new media) will extend their current building from about 2100 square meters and about 90 employees to about 5,000 square meters.

Haus der Zukunft

Can sustainable building be realized at reasonable costs?

At the development "residential Passive House Utendorfgasse" were reached very low building costs. Would there be different building costs by using ecological materials and technologies? There will be calculated additional and reduced costs by using the ecological building-catalogue and internal characteristic values of projects that are similar in design.

Haus der Zukunft

Catalogue of Passivhouse Details for Refurbishments

A Catalogue of Passivhouse Details for Refurbishments for buildings of all building periods from the 1870 to the 1980s. Special consideration to the refurbishment of building parts in contact with the earth. Integration of controlled ventilation services. Construction elements description with drawings, building physical data and ecological life cycle assessment. This project aimed at contributing to "Replicable refurbishment concepts for meeting passive house (or comparable) standard in buildings of all building periods".

Haus der Zukunft

CellPor - cellulose polymerized - new methods for the processing of a polymer-cellulose-foam according to ecological criteria in construction

The development of a spray applicable cellulose composite as insulating material on the basis of renewable resources, combined by the development of a prototype for the spray-on technology for processing the new, water free cellulose composite are the demanding challenges of this project.

Haus der Zukunft

Clay - Passiv Office-Building Tattendorf

The motivation for developing the project "Clay Passiv Office-Building Tattendorf" was the dissatisfaction with the situation of a great difference in the state of technology in three fields relevant to the research project: 1) sustainable production of energy , 2) sustainable energy conservation technologies and 3) use of sustainable building materials.

Haus der Zukunft

Connection of innovative strategies and technologies to a holistic, resources-friendly plus energy building (FUTUREbase)

On the basis of a construction project in Giefinggasse 4 in Vienna the combination of new, innovative strategies and technologies to an integrated, resources conserving plus energy building with high signaling and multiplication effect had been tested for feasibility. A regional, energetical bond between the buildings TECHbase, ENERGYbase and the Klima-Windkanal had been developed.

Haus der Zukunft

Criteria catalogue for quality assurance in the construction of passive houses built in wood

By means of a criteria catalogue possible sources of error in the construction of passive houses built in wood will be identified both craft specific and concerning the installation of house automation facilities. Solutions will be acquired, a controlling tool for construction sites will be offered.

Haus der Zukunft

Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings

The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.

Haus der Zukunft

Demonstration project LifeCycle Tower - batch-produced energy efficient timber/hybrid high-rise building system

The energy efficient building concept shall be tested with regard to its functional efficiency and real usage conditions. The demonstration project is based upon the results of previous research activities and shall be presented to a wider public. It shall illustrate the advantages of a batch-produced timber/hybrid high-rise building system which offers high quality of energy and resource efficiency.

Haus der Zukunft

Development of a solid-wood-passivehouse-window

Based on experience with low-energy-windows, a solid wood window is being developed, which meets passivehouse-standards.

Haus der Zukunft

Development of a strategy for industrialized serial production of ecological passive houses made out of renewable resources

Development of a strategy for industrialized seria. production of ecological passive solar houses made out of building materials based on renewable resources as foundation for the dissemination of sustainable solutions for the production of prefabricated houses and of single houses.

Fabrik der Zukunft

Development of high quality ecological solutions for thermal insulation systems on the basis of reed

Exterior and interior insulation systems containing reed as insulation material were developed. The solutions integrate insulation material, fastening and plaster (as well as optional heating for the interior insulation). A concept for the renovation of an old building using a reed insulation system was developed.