IEA Tasks & Annexe

There are 240 results.

Internationale Energieagentur (IEA)

IEA AFC Annex 33: Stationary Applications (Working period 2019 - 2022)

The future energy system will be strongly characterized by decentralized and renewable power generation. The use of fuel cells (FCs) can contribute to energy and environmental policy objectives. This project investigated whether a market transition from successful international demonstration plants to commercial plants is possible. The potential applications of fuel cells in the building sector and across energy communities and climate-neutral neighbourhoods were investigated.

Internationale Energieagentur (IEA)

IEA-ISGAN Annex 2: Smart Grid Case Studies (Working period 2019 - 2023)

The main objective of this working group of the International Smart Grid Action Network (ISGAN) is to provide all relevant stakeholders with access to detailed information on the current status of smart grid pilot and demonstration projects.

Internationale Energieagentur (IEA)

IEA Bioenergy Task 40: Deployment of Biobased Value-Chains (Working Period 2019 - 2021)

IEA Bioenergy Task 40 traditionally focused on international trade and supply chains of biomass for bioenergy. Starting in 2018, the systems view was broadened, also to better meet Austrian requirements. The supply chain focus was maintained, but with a broader premise: The establishment of bio-based value chains for a sustainable and fair bioeconomy.

Internationale Energieagentur (IEA)

IEA 4E: Annex Electric Motor Systems. Working period 2021 - 2024

The goal of the Annex Electric Motor Systems is to raise awareness on the large savings potential in motor systems, while showing the realization method of such a path. After publishing the policy and audit guidelines for motor systems Austria leads the task „New Industrial Developments and Digitalization in Motor Systems“.

Internationale Energieagentur (IEA)

IEA HPT Annex 56: Digitalization and Internet of Things for Heat Pumps

As digitalization progresses, heat pumps are becoming part of the Internet of Things (IoT). In this project, the opportunities and challenges of IoT-capable heat pumps for the use in households, commercial enterprises and industrial applications will be investigated and made available to the relevant target groups in the form of guidelines, data and information relevant to standards.

Internationale Energieagentur (IEA)

IEA Wind Task 27: Small Wind Turbines in High Turbulence Sites (working period 2018 - 2019)

By participating in the IEA Wind Task 27, a number of goals could be achieved, including the development of a site assessment scheme for wind turbines in areas with high turbulence intensities, the further development of the IEC 61400 standard, the participation in the “Compendium of IEA Wind TCP Task 27 case studies “And the update of the “Small Wind Power Report 2018” as well as activities such as holding the event “Small Wind Power Conference” in Austria.

Internationale Energieagentur (IEA)

IEA-ISGAN Annex 1: Global Smart Grid Inventory IEA-ISGAN and Annex 2: Smart Grid Case Studies

The international Smart Grid Action Network (ISGAN) aims to improve the understanding of Smart-Grid-technologies and to accelerate global deployment. The work in ISGAN is structured in eight standing working groups (annexes). The present project describes the Austrian contribution to Annex 1: Smart Grids Inventory and Annex 2: Smart Grids Case Studies.

Internationale Energieagentur (IEA)

User-Centred Energy Systems (UsersTCP)

The UsersTCP provides evidence from socio-technical research on the design, social acceptance and usability of clean energy technologies. Users play a central role within energy systems. The findings will support political decisions for a clean, efficient and safe energy system.

Internationale Energieagentur (IEA)

IEA EBC Annex 79: Occupant-Centric Building Design and Operation

The IEA EBC Annex 79 aims to provide new insights into comfort-related occupant behaviour in buildings and its impact on building energy performance as well as occupant-centric building design and operation.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 7: Smart Grids Transition (Workingperiod 2017-2020)

ISGAN Annex 7 deals primarily with institutional and socio-technical issues in connection with the transition of the energy system, with smart grids at its core. It thus aims to bundle international experience and interdisciplinary research activities on smart grids, to process them and to make them usable for policy makers and stakeholders.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 5: Smart Grids International Research Facility Network (SIRFN). (Working period 2019-2021)

The Smart Grids International Research Facility Network (SIRFN) aims at improving the implementation of Smart Grids technologies by collaboration between smart grid testing facilities, test beds, and large-scale demonstrations. The focus during the working period 2019-2020 was laid on the implementation of extended interoperability tests and innovative laboratory testing methods for decentralised energy resources. By active participation, Austria’s position and leading role on the forefront of international Smart Grids development was strengthened.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 6: Power Transmission and Distribution Networks (working period 2019-2020)

ISGAN aims at enhancing the knowledge about Smart Grid Technologies and accelerating their international development. In this project, relevant findings from technical-scientific projects as well as successful approaches from national and international projects on the topic of interaction between transmission and distribution system operators were collected and analyzed.

Internationale Energieagentur (IEA)

IEA PVPS Task 14: High Penetration of PV Systems in Electricity Grids (working period 2014 - 2018)

The IEA-PVPS Task 14, led by Austria as Operating Agent, promotes the use of grid connected PV as an important source in electric power systems on a high penetration level where additional efforts may be necessary to integrate the dispersed generators in an optimum manner. In a number of case studies from the participating countries, the challenges and approaches in the field of distribution networks, system management and power electronics components were shown in an international context. The result being elaborate reports with targeted recommendations and required measures to significantly increase the share of photovoltaics in electricity grids.

Internationale Energieagentur (IEA)

IEA EBC Annex 63: Implementation of Energy Strategies in Communities

As part of the "Annex 63" project, Austria has worked with 10 other countries to develop guidelines for the successful implementation of energy strategies at local level. The results include support for nine strategic measures, descriptions of case studies, support materials and recommendations for different target groups.

Internationale Energieagentur (IEA)

IEA PVPS Task 17: Photovoltaik for Transport (working period 2018 - 2021)

The IEA PVPS Task 17 focuses on the potential contributions of PV technologies to the transport sector as well as on the expected market potential of PV application in the transport sector.

Internationale Energieagentur (IEA)

IEA-IETS Task 19: Electrification of Industry

The electrification of industry can make a major contribution to CO2 reduction. The aim of the task was a transfer of knowledge between the international and the state levels. Nationally, the aim was to spread and establish the topic of “electrification of industry” through stakeholder involvement. A comparison of electrification based on roadmaps and resources was carried out and, above all, systemic aspects of electrification of industry were analysed.

Internationale Energieagentur (IEA)

IEA PVPS Task 12: Photovoltaics Sustainability (working period 2018 - 2021)

The aim of IEA PVPS Task 12 is to foster international collaboration in the area of photovoltaics and environment. That includes compiling and disseminating accurate information on environment, health, safety, and other aspects of sustainability associated with the life-cycle of photovoltaics. Results are guidelines and data basis in order to harmonize LCAs and studies on future environmental impacts of PV and PV recycling. The Austrian contribution addresses LCA and implementation of sustainability aspects.

Internationale Energieagentur (IEA)

IEA Bioenergy Task 44: Flexible Bioenergy and System Integration (Working Period 2019 - 2022)

Goal of Task 44 is to analyse bioenergy solutions that can provide flexible resources in a low carbon energy system. The objective is to improve understanding on the types, quality and status of flexible bioenergy, and identification of barriers and future development needs in the context of the entire energy system (power, heat and transport).

Internationale Energieagentur (IEA)

IEA Hydrogen (Hydrogen TCP)

The Hydrogen TCP aims to accelerate deployment and use of hydrogen technologies by carrying out and co-ordinating collaborative activities of analysis, applied research and communication.

Internationale Energieagentur (IEA)

IEA Energy Storage (ES)

The aim of the IEA Energy Storage (ES) Technology Programme is to enable integrated research, development, implementation and integration of energy storage technologies in order to optimise the energy efficiency of all types of energy systems and to promote the use of renewable energy sources instead of fossil fuels.