Suchergebnisse

Haus der Zukunft

Alternative insulation made from modified lignocellulosic fibers

Wood as the raw material for a new insulation material

Haus der Zukunft

Pallets never pall - Development of the Pallet House to series-production readiness

The winning project "Pallet House" of the EU-wide competition GAU:DI in 2007 consists of 800 (used) pallets. It has been exhibited in a scale 1:1 at the Biennale in Venice 2008 and has been developed for mass production within this project. Therefore, two exemplary scenarios were developed: (temporary) construction at Vienna's Urban Lakeside in Aspern and the construction of a low-cost building in South Africa.

Haus der Zukunft

Optimisation of ecological construction components for industrial serial production of precast elements

The project focused on passive house elements from straw and clay. Special interest was paid at a novel straw insulation as well as at an efficient drying process of the clay. Sustainability of the building materials was a very important aspect within the project.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 2: building with recycros

Building with recycros is working out basics in order to close the cycle of materials in the building sector as well as to increase the usage of recycled materials (recycros). The existing material cycles in the building sector are going to be analysed. Furthermore, there will be a catalogue presented, covering the actual situation of which materials are used in today´s engineering and how the waste is treated. The project will be completed with a summary of results and a proposal of concrete materials and constructional systems for the building project gugler.

Fabrik der Zukunft

Wärmedämmstoff aus Rohrkolben

Entwicklung der Herstellungs-Technologie für Rohrkolben-Dämmstoffe. Grundlagenstudie zur Machbarkeit der Serienfertigung.