Search results

There are 92 results.

Haus der Zukunft

"Communal living for elderly - ecological, social and economical aspects" - eco-com.60+

The research project examined different forms of communal living of elderly people and contributes to the development of new, common forms of living for the elderly. Questions concerning demographic change and economic as well as ecologic challenges of our time had been dealt with.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 3: recyclable constructing

Development of basic principles and proposals for highly recyclable constructions. A catalogue with main principles of recyclable designing with a particular focus on material inherent bonding and joint techniques as well as a selection of constructions including ecological benchmarks, calculation of building physics plus costs was created.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 5: Ecoeffective building

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 6: Integration of the C2C production into the flagship project Gugler

Print and media production at the media and communications company gugler GmbH are currently being optimized according to Cradle to Cradle (C2C) criteria. The goal of this subproject is to allow the demands of a C2C production process optimized for exchange with biological cycles to be included into the general planning of the new production building of the company, a pilot project within the "building of tomorrow" program line.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 9: Monitoring Gugler - Monitoring, evaluation, optimization GUGLER

The project objective is the measurement of relevant building values (energy consumption, ...), the evaluation of these values compared with the intended objectives and the optimization of the system based on the measured data. As a special innovation, monitoring the storage of alternatively generated electricity using photovoltaic and wind energy in the form of compressed air must be considered.

Haus der Zukunft

BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability

The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.

Haus der Zukunft

BIGMODERN - Subproject 11: Dissemination of project results

The project is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups, such as decision makers inside the BIG Bundesimmobiliengesellschaft, various users of federal buildings and other real estate companies nationally and internationally.

Haus der Zukunft

BIGMODERN - Subproject 2: Demonstration project of an official building in Bruck

In the frame of this subproject being part of the flagship project BIGMODERN, a decision matrix as well as a handbook for planning, including feasibility analysis and a collection of information, serving as decision guidance for planning and implementation of sustainable building refurbishment, is being developed. In this way, the risk for planners and builders of the usage of new sustainable technologies shall be minimised.

Haus der Zukunft

BIGMODERN - Subproject 5: Feasibility studies about innovative technical solutions

The application of innovative technologies means additional planning and coordination effort which usually cannot be incorporated into the conventional planning processes of the BIG. To overcome these barriers for the application of innovative technologies, the sub project at hand aims at preparing information, feasibility studies, planning records, experiences and practical examples in a way, that they can be implemented directly into the planning process.

Haus der Zukunft

BIGMODERN - Subproject 6: Incentives to enforce energy efficiency and sustainability in moderniza­tions of BIG-buildings

Development of approaches, which lead to general conditions for complete refurbishments in BIG-buildings, which support high standards regarding energy efficiency and sustainability. This will ensure high-quality modernizations for BIG's real estate.

Haus der Zukunft

BIGMODERN - Subproject 8: Demonstration building Amtshaus Bruck - Realisation

In the frame of the flagship project BIGMODERN the "Amtshaus Bruck an der Mur" had been renovated according to above-average quality standards concerning energy efficiency and sustainability while complying with an industrial management point of view.

Haus der Zukunft

BIGMODERN - Sustainable refurbishment standards of federal buildings constructed between 1950 and 1980

The project aims at developing sustainability and climate protection criteria for the refurbishment of federal buildings of the postwar period. These criteria will be tested for their practical suitability within the framework of demonstration projects. Subsequently, these criteria will be defined as fundamental guiding principles in the planning and building processes for all future BIG retrofit projects.

Haus der Zukunft

BIGMODERN Subproject 3: Demonstration building University Innsbruck - Main building of the Faculty for Technical Sciences - Planning process

Demonstration of feasibility of renovation of an official building in high thermal and energetical quality and consideration of further sustainable criteria.

Haus der Zukunft

BIGMODERN Subproject 7: Monitoring concept

Development of a pattern for comprehensive documentation of the project results. The concepts contain amongst others monitoring of energy consumption, resources, costs, functionality and comfort, etc.

Stadt der Zukunft

BONSEI! Optimal use of existing buildings – energy efficient implementation of renovation!

The project BONSEI! would like to support an energy efficient and socially acceptable densification of privately owned residential buildings in urban space and to develop a methodological basis for resource efficient urban areas. The results are used for the conception of an innovative service in order to provide a neutral consulting regarding private densification plans.

Haus der Zukunft

Building of Tomorrow for the construction industry

Dissemination of results of the research initiative "Building of tomorrow" for two specific target groups - master builder and installer - implementation in further vocational training concepts

Haus der Zukunft

Catalogue of Passivhouse Details for Refurbishments

A Catalogue of Passivhouse Details for Refurbishments for buildings of all building periods from the 1870 to the 1980s. Special consideration to the refurbishment of building parts in contact with the earth. Integration of controlled ventilation services. Construction elements description with drawings, building physical data and ecological life cycle assessment. This project aimed at contributing to "Replicable refurbishment concepts for meeting passive house (or comparable) standard in buildings of all building periods".

Haus der Zukunft

Certified passive attic conversion of a typical building from the period around 1900

Conversion of an attic of a typical building from the period about 1900 to a passive attic with photovoltaic system and renovation of the existing building equipment. The aim is to keep the additional construction costs under 10 %, to avoid overheating in summer and to make possible a reproduction for the large amount of buildings from the same period.

Haus der Zukunft

Climate neutral buildings from the period of promoterism - ways, potentials and possibilities of implementation

The focus was on the goal-oriented and economic options, in order to achieve a CO2-neutral energy supply and hermetically sealed building envelope as well as to show high energy efficiency when using. On the other hand building protection regulations and the quality in use are to be considered.

Haus der Zukunft

Construction Site SCHOOL - Sustainable Models for the Refurbishment of School Buildings?

In this research project, models for refurbishment and restructuring of school buildings were developed. The reconstruction concepts contain lists of measures for deploying sustainable building techniques and exemplary case studies for the reorganisation of buildings of different typologies.