Search results

There are 151 results.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 5: Smart Grids International Research Facility Network (SIRFN). (Working period 2013-2018)

The Smart Grids International Research Facility Network (SIRFN) aims at improving the implementation of Smart Grids technologies by collaboration between smart grid testing facilities, test beds, and large-scale demonstrations. By active participation, Austria’s position and leading role on the forefront of international Smart Grids development has been strengthened.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 5: Smart Grids International Research Facility Network (SIRFN). (Working period 2019-2021)

The Smart Grids International Research Facility Network (SIRFN) aims at improving the implementation of Smart Grids technologies by collaboration between smart grid testing facilities, test beds, and large-scale demonstrations. The focus during the working period 2019-2020 was laid on the implementation of extended interoperability tests and innovative laboratory testing methods for decentralised energy resources. By active participation, Austria’s position and leading role on the forefront of international Smart Grids development was strengthened.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 5: Smart Grids International Research Facility Network (SIRFN). (Working period 2021-2022)

The Smart Grids International Research Facility Network (SIRFN) aims at improving the implementation of Smart Grids technologies by collaboration between smart grid testing facilities, test beds, and large-scale demonstrations. In the working period 2021-2022, the focus will be laid on the development of extended interoperability tests for decentralised energy resources and micro grids.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 6: Electricity Transmission and Distribution Systems (working period 2021-2022)

ISGAN Annex 6 deals with the possible system-related challenges in the development of future smart grids. Austria is leading Task 4 Interaction of Transmission and Distribution Networks. The main topic in the work program relates to flexibility topologies within transmission and distribution grids. The results and analyses had been published on the one hand in a discussion paper and in condensed form in a video. Communication and dissemination activities were targeted and conducted to different stakeholder groups.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 6: Power Transmission and Distribution Networks (working period 2019-2020)

ISGAN aims at enhancing the knowledge about Smart Grid Technologies and accelerating their international development. In this project, relevant findings from technical-scientific projects as well as successful approaches from national and international projects on the topic of interaction between transmission and distribution system operators were collected and analyzed.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 6: Power Transmission and Distribution Systems (working period 2017 - 2018)

ISGAN aims at enhancing the knowledge about Smart Grid Technologies and accelerating their international development. The main objective of the Austrian participation in IEA ISGAN Annex 6 is to acquire knowledge and develop long-term concepts for the development of an intelligent electricity system, with the focus on the interaction of distribution and transmission networks.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 7: Smart Grid Transitions (Working period 2020-2023)

ISGAN Annex 7 aims to bundle international experience and interdisciplinary research activities on smart grids, to synthesize them and to make them usable for policy makers. These include social, economic and humanities research on institutional framework conditions of transition, in particular on governance issues, as well as the development of processes for the broad participation of relevant stakeholders in smart grids transition processes.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 7: Smart Grids Transition (Workingperiod 2017-2020)

ISGAN Annex 7 deals primarily with institutional and socio-technical issues in connection with the transition of the energy system, with smart grids at its core. It thus aims to bundle international experience and interdisciplinary research activities on smart grids, to process them and to make them usable for policy makers and stakeholders.

Internationale Energieagentur (IEA)

IEA ISGAN Working Group 6 Transmission and Distribution Network Systems (working period 2023-2024)

IEA ISGAN Working Group 6 addresses the challenges in the overall system of transmission and distribution networks for electricity. The results will improve the understanding of the impact of smart grid technologies on the overall system performance, transmission capacities and operational management of public electricity supply systems. In the project years 2022-2023, international pilot projects on flexibility use and the necessary interaction of transmission and distribution grid operators will be summarised and conclusions drawn.

Internationale Energieagentur (IEA)

IEA ISGAN Working Group 6: Transmission and Distribution Network Systems (Working period 2025-2026)

IEA ISGAN Working Group 6 focuses on Power Transmission and Distribution Systems (T&D), addressing challenges in developing future smart grids. It promotes technology deployment and strategic adoption to enhance the safe and secure supply of electricity. This supports electrification expansion, renewable integration, distributed generation, and customer engagement. During 2025-2026, the project will explore grid-forming inverters and their impact on the power grid and stakeholder interactions.

Internationale Energieagentur (IEA)

IEA ISGAN Working Group 7: Smart grids transitions of the institutional change (Working period 2023-2026)

The aim of ISGAN Working Group 7 is to bundle international experiences and interdisciplinary research activities on smart grids, process them and make them usable for policy makers and regulators. These include social, economic and humanities research on the institutional framework conditions of the transition, in particular on governance issues, as well as the development of processes for the broad participation of relevant social groups in smart grid transition processes.

Internationale Energieagentur (IEA)

IEA ISGAN Working Group 9: Flexibility Markets - Development and Implementation (Working Period 2021 - 2023)

ISGAN Working Group 9 focuses on flexibilities in the power system and related market mechanisms. Main work areas include the integration of trading with flexibilities (redispatch), investigation of the needs of different market participants, identification and definition of flexibilities and their characteristics, development and scaling of interoperable flexibility markets, consumer-oriented understanding of flexibilities and the avoidance of stability or security losses due to diversity loss.

Internationale Energieagentur (IEA)

IEA ISGAN Working Group 9: Flexibility Markets - Development and Implementation (Working Period 2023 - 2025)

ISGAN Working Group 9 focuses on flexibilities in the power system and related market mechanisms. Main work areas include the integration of trading with flexibilities (redispatch), investigation of the needs of different market participants, identification and definition of flexibilities and their characteristics, development and scaling of interoperable flexibility markets, consumer-oriented understanding of flexibilities and the avoidance of stability or security losses due to diversity loss.

Internationale Energieagentur (IEA)

IEA Industrial Energy-Related Technologies and Systems (IETS TCP)

The Industrial Energy-Related Technology Programme (IETS) focuses on energy use in a broad range of industry sectors. It fosters international co-operation amongst relevant research strands, networking within and across industrial sectors, as well as exchange of information and knowledge between experts from industry, science and politics.

Internationale Energieagentur (IEA)

IEA International Smart Grid Action Network (ISGAN) Annex 6 on Power T&D Systems. Working period 2015 - 2016.

The International Smart Grid Action Network (ISGAN) aims in enhancing the knowledge about Smart Grid Technologies and accelerating the development and the international deployment. The main objective of the Austrian contribution in IEA ISGAN Annex 6 is to build up knowledge and long term concepts for the development of an intelligent and integrated electricity system, with the focus on the interaction of distribution and transmission networks, including the lead of the related subtask within the Annex.

Internationale Energieagentur (IEA)

IEA SHC Task 59/EBC Annex 76: Deep Renovation of Historic Buildings - Towards lowest possible energy demand and CO2 emission (nZEB)

The goal of Task 59 was to document international best practice examples (knowledge base), develop a multidisciplinary planning process, and develop holistic retrofit solutions for historic buildings. As a knowledge base, the Historic Building Retrofit Atlas (www.HiBERatlas.com) emerged from the project. In the HiBERatlas more than 55 best practice examples are documented. In addition to the management of Subtask A (Knowledge Base) and Subtask C (Conservation compatible retrofit solutions & strategies), innovative technical and organizational retrofit solutions, which have already been applied in national demonstration projects and tested in practice, have been incorporated and further developed through the Austrian participation.

Internationale Energieagentur (IEA)

IEA SHC Task 61/EBC Annex 77: Integrated Solutions for Daylighting and Electric Lighting

Lighting accounts for around 15% of global electricity consumption - intelligent coordination of daylighting and electric lighting solutions together with integral lighting controls enable significant energy savings. At the same time, the solutions must be optimally planned in a user-centered approach based on the visual and non-visual effects of light. The task analysed user requirements as well as existing technologies and design methods and documented exemplary implementations in case studies.

Internationale Energieagentur (IEA)

IEA TCP AFC Annex 33: Fuel Cells for Stationary Applications (Working period 2022 - 2024)

The task focus is on the analyses of decentralized hydrogen concepts in climate-neutral neighborhoods or renewable energy communities. Based on decentralized hydrogen energy concepts and in combination with electrolysers and hydrogen storage systems, stationary fuel cells will improve self-consumption rates of the renewable energy sources produced on site. Furthermore, the grid consumption of electrical energy will be reduced and the resilience of the energy system will be increased.

Internationale Energieagentur (IEA)

IEA UsersTCP Empowering all: Gender in policy and implementation for achieving transitions to sustainable energy (Working period 2022-2024)

Previous work in the Task suggests that countries with higher income levels pay little attention to inclusive energy (-technology) use and its implications. Therefore, this project focuses on obtaining more data on the gender aspects of energy users through a survey, developing guidelines on inclusive technology development, and communicating the overall research results with interested stakeholders.