Search results
There are 534 results.
6D BIM-Terminal: Missing Link for the development of CO2 neutral buildings
The present project aims to close the gap between specialist consultants and Building Information Modeling (BIM) applications. For that, relevant data for cost estimation, scheduling construction planning and management or sustainable building operation and facility management, shall be added automatically to BIM elements and imported into the respective specialist planning software. This data exchange shall be carried out using IFC interface according to ÖNORM A6241-2 and the properties of the ASI properties server via a central platform, the "6D BIM-Terminal".
ABC - DisposaL - Assessment of Building and Construction - Disposal LCA Indicators for the disposal performance of construction
A framework of assessment for the disposal of building materials, constructions and buildings will be developed. The results will be included in the OI3-indicator and in the building assessment tool Total Quality Building. Demonstration projects of the programme Building of Tomorrow will be assessed with the new method.
AC/DC Office Buildings - Implementation of Electricity Networks with Alternating and Direct Current in Office Buildings - Feasibility and Energy Efficiency Potentials
Based on a literature and technology review this projects aimed to document and demonstrate already available and reasonable concepts for the implementation of electricity networks with alternating and direct current in modern office buildings. Focus of the study was to assess the feasibility in general and the energy efficiency potential in particular but it also documents necessary technical equipment and expected advantages and disadvantages. Additionally, important research questions for energy supply, energy distribution and application of direct current technologies were formulated.
AFOM - Automatic failure and optimisation analysis by data-acquisition
In the project, methods will be developed for analysing measured value curves to detect changes in operation or failures in the system. By integrating BIM data of buildings, corresponding models will be generated to validate the heating, ventilation, and air conditioning (HVAC)-networks, which will be used for analysis.
AGelFa - Development of surface structurable final-coating stucco systems on high-performance heat-insulating aerogel insulation plaster for historic building facades.
High-performance insulating plaster systems represent an important option toward improving the thermal insulation of historic buildings without changing their physical appearance. The high-performance aerogel insulation plaster has recently become available for deployment. In this context, the present will explore final stucco systems suitable for building with structured surfaces.
AIA4ALL - development of open, modular and automatable employer’s information requirements (EIR) and BIM execution plan (BEP)
The Employer's Information Requirements - EIR (German: AIA) - serves the client to define goals and use cases for a BIM-based construction project. The aim of this project is to create a modular, machine-readable AIA that can be seamlessly integrated into the tool landscape of openBIM projects. This is done by developing an open platform for creating use cases for the AIA.
AIDA – Affirmative Integrated Energy Design Action
The AIDA project aimed to increase the number of nearly-zero-energy-buildings, the number of building professionals trained on integrated energy design and the number of municipalities starting to build/refurbish buildings to nZEB levels.
AR-AQ-Bau - Use of Augmented Reality for acceptance and quality assurance on construction sites
The aim of this research project is the development of a construction site-suitable augmented reality (AR) system included a Remote-Expert-System and a BIM-Closed-Loop data transfer system for improving the quality of construction, building security and energy efficiency as well as increasing the efficiency of construction investigation.
AR-HES-B – Energy storage, production and recovery of valuable substances in wastewater treatment plants
AR-HES-B develops technologically based concepts of municipal wastewater treatment plants in order to convert them from energy consumers into a hybrid energy provider, energy storage and a provider of resources. The concept enables wastewater plants to turn into an important platform in the regional energy and mass transfer.
ARIS - Application of non-linear control engineering and implementation of intelligent sensor systems for the improvements of energy efficiency in the building sector
The major goal of the project was the development of innovative control concepts for controlling and optimizing heating, cooling and ventilation systems (HVAC) as well as building loads. The implementation of advanced, energy efficient non-linear control techniques in building management systems is supported by new sensor technologies that are applied to building and energy systems in order to improve their energy-efficient operation.
Active know-how-transfer sustainable building with renewable raw materials - lecture in theory and practice at the Technical University of Vienna
Lecture "Sustainable Building with Renewable Resources" focusing on theoretical and practical knowledge of straw bale building and including relevant research results of "Building of Tomorrow "
Alternative insulation made from modified lignocellulosic fibers
Wood as the raw material for a new insulation material
An innovative approach for facades with optimised noise protection and natural ventilation
The aim of this project was to advance the state of the art in the engineering of double-leaf building facades that facilitate natural ventilation while providing sufficient sound insulation. Realization of natural (window) ventilation is in some instances difficult due to a number of factors. Thereby, noise pollution (especially traffic noise) plays an important role. To address these issues, the project explored innovative solutions in terms of facade constructions for concurrent natural ventilation and noise control.
Analysis and evaluation of structural additional costs for passive house projects
Structural extra costs of passive houses decide whether these will become accepted at the market. Within the project the costs of several "Building of tomorrow" passive houses were compared. The results enable estimations for future passive house projects.
Analysis for positioning a R&D-focus on "Building integrated Photovoltaic" in Austria
This study investigates if technologies of building integrated Photovoltaic could be developed and produced in Austria for being competitive on the global market. What starting position of the national PV industry and research is given and what steps are needed in order to seize this opportunity.
Analysis of the high-quality wooden facade in extreme climates
The project "Alpine base Schiestlhaus on the Hochschwab, which was opened in 2005, represents a lighthouse project for the "House of the Future" programme as the 1st shelter in zero-energy house quality. After more than 15 years in operation, however, damages came to light. Within the framework of this project, analysis activities were carried out on the cause of damage as well as the development of new facade structures.
Anergy2Plus - Demonstration and expansion of an anergy network as part of a holistic energy concept and plus energy quarter
The overall objective of the project is to pursue and demonstrate a holistic approach to the design, construction and ultimately the use of the residential quarter in the context of energy supply. Especially in the area of thermal energy supply, a project with lighthouse character on the way to a plus-energy quarter is to be created by demonstrating the innovative supply concept based on an anergy network.
ArcheNEO - an energy-autonomous office park in Kitzbühel
ArcheNEO is a highly energy efficient office park, that produces more energy than it needs. It features an integrated energy concept that saves energy, uses renewable energies in combination with electric mobility and batteries as electricity storage and manages energy and was planned and built in Kitzbühel Oberndorf. The demonstration object will be multiplied and exported.
Architectural Concept for Musicians
Starting from the special needs of a specific user group, an Architectural Concept for Musicians will be proposed and realized, with Housing as principal functional usage.
BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability
The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.