Project-Imagepool

There are 109 results.

Terms of use: The pictures on this site originate from the projects in the frame of the programmes City of Tomorrow, Building of Tomorrow and the IEA Research Cooperation. They may be used credited for non-commercial purposes under the Creative Commons License Attribution-NonCommercial (CC BY-NC).

Models for IoT heat pumps

Models for IoT heat pumps

Products and services for IoT heat pumps

Products and services for IoT heat pumps

IoT participation of heat pumps

IoT participation of heat pumps

Use of runtime data in a knowledge base

Use of runtime data in a knowledge base

Stakeholders in the life cycle of IoT enabled heat pumps

Stakeholders in the life cycle of IoT enabled heat pumps

Membrane distillation (MD) laboratory plant at AEE INTEC in Gleisdorf

Membrane distillation (MD) laboratory plant at AEE INTEC in Gleisdorf

Data evaluation of the contact angle on an used membrane

Data evaluation of the contact angle on an used membrane

Contact angle measurement for membrane properties assessment

Contact angle measurement for membrane properties assessment

Example of solar shading of a public walkway in Dubai, United Arab Emirates

Example of solar shading of a public walkway in Dubai, United Arab Emirates

Example of Façade-integrated Shading - Masdar City, United Arab Emirates

Example of Façade-integrated Shading - Masdar City, United Arab Emirates

Example of a green façade on a Viennese Apartment Building

Example of a green façade on a Viennese Apartment Building

Definition of Resilience

Definition of Resilience

Scope of Resilience Definition

Scope of Resilience Definition

Group picture IEA Task 40

Group picture IEA Task 40

Header image IEA TCP HEV Task 40

Header image IEA TCP HEV Task 40

Logo IEA TCP HEV Task 40

Logo IEA TCP HEV Task 40

Visibility and Obervability of distribution grid assets and grid status

Visibility and Obervability of distribution grid assets and grid status

Data exchange between different stakeholders as a challenge

Data exchange between different stakeholders as a challenge

Overview of the tasks of Working Group 9 and the methods used in Task 4

Overview of the tasks of Working Group 9 and the methods used in Task 4

AMF Task 63: Development of SAF in Austria

AMF Task 63: Development of SAF in Austria