IEA Tasks & Annexe

There are 126 results.

Internationale Energieagentur (IEA)

IEA PVPS Task 1: Strategic PV Analysis & Outreach (Working period until 2022)

This task, which is mandatory for all countries participating in the IEA-PVPS program, has been producing global reports on photovoltaic development since 1993. In addition, content-related priorities are set, or new topics and tasks are developed, which are then sent to the ExCo for decision-making. This gives Task 1 strategic importance for the overall IEA PVPS program.

Internationale Energieagentur (IEA)

IEA PVPS Task 15: Acceleration of BIPV

Building integrated Photovoltaics (BIPV) is one of the future markets for Photovoltaics which enables the combination of architecture and energy technology. The project focussed on further national research in the area of BIPV, which is to be raised to an international level.

Internationale Energieagentur (IEA)

IEA Wind Task 19: Wind Energy in Cold Climates (working period 2016 - 2018)

IEA Wind Task 19 deals with the challenges of the utilisation of wind energy in Cold Climates (i.e. under icing-conditions) and offers through global networking and mutual exchange of experience, the possibility of collecting and generating additional know-how. Aim of the subtask was to share experiences with international partners and standardising of icefall risk assessments. In addition, an evaluation report on the functionality of the new Vestas rotor blade heating system was published.

Internationale Energieagentur (IEA)

IEA Bioenergy Task 37: Energy from Biogas (Working Period 2016 - 2018)

Participation as Austrian representative in the expert group during the period 2016-2018 in order to achieve knowledge-exchange, establishment of technical reports and recommendations, as well as dissemination of the gained information to Austrian stakeholders.

Internationale Energieagentur (IEA)

IEA Bioenergy Task 32: Biomass Combustion and Co-firing (Working Period 2016 - 2018)

Austrian participation in Task 32 "Biomass Combustion and Cofiring" in the working period 2016-2018 and active participation in the defined Task main objectives, events and projects which are of relevance for Austria. International and national dissemination and networking activities for information exchange and for the initiation of cooperation.

Internationale Energieagentur (IEA)

IEA-Bioenergy Task 42: Biorefining in a Circular Economy (Working Period 2016 - 2018)

The task deals with the analysis and dissemination of relevant information concerning biorefineries. In the last period the focus was on the development of an open-access tool for the TEE-evaluation (Technical/Economic/Environmental Assessment) of biorefineries.

Internationale Energieagentur (IEA)

IEA Wind Task 32: Wind lidar systems for wind energy deployment (Working period 2016-2019)

Since 2012 Task 32 of IEA Wind has been concerned with the development and the multiple challenges in the application of LIDAR (light detection and ranging) applications in wind energy. The aims of this international research cooperation are the compilation of existing knowledge and experience as well as the elaboration of new conclusions through mutual exchange and global networking.

Internationale Energieagentur (IEA)

IEA PVPS Task 12: PV Environmental Health And Safety (working period 2016-2018)

The aim of IEA PVPS Task 12 is to foster international collaboration in the area of photovoltaics and environment. That includes compiling and disseminating accurate Information on environment, health, safety, and other aspects of sustainability associated with the life-cycle of photovoltaics. The austrian contribution addresses LCA, implementation of sustainability aspects and dissemination.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 5: Smart Grids International Research Facility Network (SIRFN). (Working period 2013-2018)

The Smart Grids International Research Facility Network (SIRFN) aims at improving the implementation of Smart Grids technologies by collaboration between smart grid testing facilities, test beds, and large-scale demonstrations. By active participation, Austria’s position and leading role on the forefront of international Smart Grids development has been strengthened.

Internationale Energieagentur (IEA)

IEA Bioenergy Task 39: Commercialization of Conventional and Advanced Liquid Biofuels from Biomass (Working Period 2016 - 2018)

IEA Bioenergy Task 39 deals with the commercialization of conventional and advanced biofuels, including innovative raw materials such as micro-algae, their economic, environmental and social assessment and the investigation of relevant policies. Findings from countries with a committed biofuels policy are made accessible to Austria, and success stories of Austrian industry, research and policy are promoted internationally.

Internationale Energieagentur (IEA)

IEA EBC Annex 68: Indoor Air Quality Design and Control in Low Energy Residential Buildings

In this project, the scientific basis and data for a coupled calculation and evaluation of indoor air quality and energy efficiency of residential buildings were developed. Assessment metrics and detailed air pollutant models were developed and integrated into the building simulation to derive guidance for the planning and operation of energy-efficient residential buildings.

Internationale Energieagentur (IEA)

IEA SHC Task 42/ECES Annex 29: Compact Thermal Energy Storage - Material Development for System Integration

The key accomplishments of the task are summarized in the following points: New material characterizing methods were investigated, a new standard for an improved DSC measurement method has been developed, a data base for PCM, TCM and sorption materials was developed and established, advances in the numerical modelling of materials, compact thermal storage systems were developed for different material applications, a tool for the economic evaluation of thermal energy storages has been developed. Also numerous joint R&D Projects and more than twenty publications arose from the IEA-SHC Task 42 networking activity.

Internationale Energieagentur (IEA)

IEA ES Annex 50: Prefab Systems for Low Energy/High Comfort Building Renewal

Development of integrated concepts for multi-storey buildings, which enable renovations of buildings with high energy efficiency at good user acceptance during the realisation phase as well as afterwards (comfort, affordability). Relevant components: integrated solutions of roof and façade with high rate of pre-fabrication, the possibility of integrating the energy façade/roofs and energy distribution and supply.

Internationale Energieagentur (IEA)

IEA 4E Annex: Electric Motor Systems. Working period 2008 - 2011

Promotion of energy efficiency of poly-phase electric AC motors and motor systems in relevant applications as pumps, fans, compressors and mechanical drives that are generally used in industry, infrastructure and large buildings. This work also included new technologies such as frequency inverters (adjustable speed drive) and permanent magnet motors.

Internationale Energieagentur (IEA)

IEA Bioenergy Task 42: Biorefinery (Working Period 2007 - 2009)

Austrian Participation on IEA Bioenergy Task 42: "Biorefineries - Co-production of Fuels, Chemicals, Power, and Materials from Biomass", Triennium 2007 to 2009

Nachhaltig Wirtschaften

IEA Bioenergy Task 40: Sustainable International Bioenergy Trade - Securing Supply and Demand (Working Period 2010 - 2012)

Relevant international trade currents of biomass for Austria as well as frame conditions for sustainable use of biomass have been analysed and documented. One of the key issues was to analyse certification procedures for sustainable bioenergy products.

Nachhaltig Wirtschaften

IEA Bioenergy Task 33: Thermal Gasification of Biomass (Working Period 2010 - 2012)

Obtaining, processing and dissemination of information about inter­national development in the field of thermal gasification of biomass as well as leadership of several key aspects of the task.

Internationale Energieagentur (IEA)

IEA Bioenergy Task 38: Greenhouse Gas Balances of Biomass and Bioenergy Systems (Working Period 2004 - 2007)

The main objective of Task 38 is, to calculate, on a full fuel cycle basis, greenhouse gas balances of selected biomass and bioenergy systems by applying and improving the existing standard methodology.

Energiesysteme der Zukunft

IEA SHC Task 32: Advanced Heat Storage Concepts

IEA SHC Task 32 deals with advanced storage concepts for low energy buildings. In the project storages based on phase change materials are used in solar combisystems, in order to reduce the emissions and increase the efficiency of biomass- and gas boilers and to increase the solar fraction

Internationale Energieagentur (IEA)

IEA Bioenergy Task 42: Biorefining - Sustainable Processing of Biomass into a Spectrum of Marketable Bio-based Products and Bioenergy (Working Period 2010 - 2012)

Further development of the biorefinery classification system, identi­fication of relevant biomaterial, development potential for energy and product oriented biorefineries, guideline for sustainability evaluation, global perspective on biorefineries, dissemination of knowledge, networking and involvement of stakeholders, country reports and trainingscourse.Kurzfassung