Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"
M-DAB2: Material intensity of inner development - resource assessment and localization of urban development potentials
For the first time, the material intensity of inner development (in terms of material quantities) for different design variants is to be considered in the evaluation of inner development potentials. A set of methods for the holistic evaluation of potential areas and different development variants and scenarios for resource-saving inner development will be created.
Vertical Farm Aspern - Democratization of vertical farming under consideration of parameters of circular economy
Planning, construction and optimization of a vertical farm for urban food production, involving the users in the operational management. The building and the operator concept represent the entire food value chain, from planting to selling.
Joining Cards - Investigation of de-constructable fastening and joining techniques for the development of mono-material interior systems made of cardboard
Strategic examination of cardboard products and paper-based materials for the development of de-constructible interior systems and the definition of building components and their interfaces. The result forms the basis for further research projects in the form of a comprehensive knowledge gain.
SAVE circular approaches for green buildings!
The project demonstrates the cycle and use of synergies in an ARWAG residential building from the extraction of valuable raw materials through a urine treatment plant (fertilizer) using energy recovery measures (heat recovery, heat pump, photovoltaics) to the use of the fertilizer for the generously designed greening measures and the associated effects on the microclimate.
The Green Parking Space – Utilization of urban parking areas for production of biomass
Many traffic areas in urban environments are actually used as such only a small fraction of the time. Subject of this project was to investigate the possibility of using those areas by additional integration of photobioreactors for the production of biomass, integrating such systems to the maximum extent into the urban substance and energy cycles.
R-Bau - Development of a replicable deconstruction strategy for residential buildings to force the recovery-oriented dismantling
The aim of the project was to develop a replicable deconstruction strategy for residential buildings to force the recovery-oriented dismantling. The key aspects of the project are the development of standardized building models in order to analyse the recovery-oriented dismantling process, the design of a deconstruction catalogue and the transfer of the project findings to refurbishment, design and erecting of residential buildings.