Suchergebnisse
StromBIZ - demonstration projects: business models for decentralized electricity generation and distribution
Feasible business models to utilize locally generated renewable energy are expected to induce a tipping point for the "Energy Turnaround" in Austria. Within the proposed project a number of demonstration PV plants on residential and non-residential buildings had been realized. On this basis new approaches of business cases had been developed, implemented, tested and disseminated.
Using buildings as energy storage - Monitoring project: Detached house H and detached house F Energy source wind power – Energy source solar power
Monitoring and comparison of performance of thermally activated building components in two similarly built, inhabited detached houses with different energy sources (wind and solar power). The functionality of energy supply through wind power or solar energy will be investigated as well as the verification of the practicability of self-regulating system control due to building temperature behaviour. The results provide an insight into the calculation assumptions, system control and feasibility of the smart grid technology.
Stakeholder process of the initiative "Reference architecture for secure Smart Grids in Austria"
The project worked out the development of a smart grids reference architecture for Austria under involvement of all actors. Based on technological-scientific elements a process which met the requirements of stakeholders like operators of infrastructure, industry and also public agencies had been worked out to achieve nationally accepted and internationally orientated reference architecture.
LTS-Flywheel als 12h-Energiespeicher: Neue Ansätze zur Erhöhung der wirtschaftlich nutzbaren Speicherzeit und Sicherheit
Entwickelt wurden die Grundlagen für ein Long Term Storage (LTS)-Flywheel zur dezentralen Zwischenspeicherung von elektrischer Energie (z.B. aus Windkraft- oder PV-Anlagen), mit wesentlich höherer Speicherzeit (Ziel: 12h) und Betriebssicherheit bei geringen Systemkosten. Dieses Projekt stellt die Basis für einen weiteren Schritt Richtung Plus-Energie-Haus dar.