Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"

Haus der Zukunft

Stakeholder process of the initiative "Reference architecture for secure Smart Grids in Austria"

The project worked out the development of a smart grids reference architecture for Austria under involvement of all actors. Based on technological-scientific elements a process which met the requirements of stakeholders like operators of infrastructure, industry and also public agencies had been worked out to achieve nationally accepted and internationally orientated reference architecture.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 3: Benefit/Cost Analyses and Tools of Smart Grids

Together with experts from 11 countries, the EI-JKU has analysed cost-benefit models and developed proposals for their adaptation and further development. In the course of the work, the EI-JKU dealt in particular with two questions: how such an evaluation model can be adapted to Austrian conditions and which socio-economic factors influence the question of whether an end consumer emerges as a winner or loser from Smart Grid-based functionalities.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 5: Smart Grids International Research Facility Network (SIRFN). (Working period 2019-2021)

The Smart Grids International Research Facility Network (SIRFN) aims at improving the implementation of Smart Grids technologies by collaboration between smart grid testing facilities, test beds, and large-scale demonstrations. The focus during the working period 2019-2020 was laid on the implementation of extended interoperability tests and innovative laboratory testing methods for decentralised energy resources. By active participation, Austria’s position and leading role on the forefront of international Smart Grids development was strengthened.

Haus der Zukunft

P2H-Pot - Potentials, economic feasibility and system solutions for Power-to-Heat

P2H-Pot has identified economically feasible potentials for Power-to-Heat (P2H) in urban regions. The suitability of different technical system configurations were investigated using thermodynamic simulation and considering experiences from Scandinavian cases. The assessment of short, medium and long term relevance and economic feasibility of P2H were accomplished by simulating model-based scenarios up to 2050 of the Austrian and German electricity and heat market. In cooperation with a district heating company three case studies have been carried out.

Haus der Zukunft

Passivhauswohnen³: Facility Management for Residential Property Developers: A Key to Optimizing the Reduction of Energy and Operation Costs

What soon will be considered "standard" in ecological building must be carried out by the property developer and accepted by the future user. Therefore, in order to assist a smooth implementation of the new passive housing technique and begin the corresponding feedback mechanisms, a specific KMU "quality and incentive model" should be launched. The interrelationship of this model is designed with the property developer as well as the user in mind and aims for lasting "behavior modification" in energy and operational expense consumption.