Project-Imagepool

There are 142 results.

Terms of use: The pictures on this site originate from the projects in the frame of the programmes City of Tomorrow, Building of Tomorrow and the IEA Research Cooperation. They may be used credited for non-commercial purposes under the Creative Commons License Attribution-NonCommercial (CC BY-NC).

Remote-Expert-System

Remote-Expert-System

mindmap measures

mindmap measures

mindmap opportunities

mindmap opportunities

mindmap framework conditions

mindmap framework conditions

mindmap barriers/obstacles

mindmap barriers/obstacles

Point Cloud of the Use Case

Point Cloud of the Use Case

Cost and time effort for the generation of Material Passports (MPv1-4)

Cost and time effort for the generation of Material Passports (MPv1-4)

Different Urban Densification Scenarios #2 - Use Case Area Triesterstraße/Graz

Different Urban Densification Scenarios #2 - Use Case Area Triesterstraße/Graz

Different Urban Densification Scenarios #2 - Use Case Area Triesterstraße/Graz

Different Urban Densification Scenarios #2 - Use Case Area Triesterstraße/Graz

natural-lighting issue: sharp angle between buildings

natural-lighting issue: sharp angle between buildings

Different Urban Densification Scenarios #1 - Use Case Area Triesterstraße/Graz

Different Urban Densification Scenarios #1 - Use Case Area Triesterstraße/Graz

Visualization of the planning parameters as well as their components in the NaNu3 model.

Visualization of the planning parameters as well as their components in the NaNu3 model.

Graphical comparison of two different flat roof use cases.

Graphical comparison of two different flat roof use cases.

Concept of NaNu3 framework, selected roof elements, and performance indicator groups.

Concept of NaNu3 framework, selected roof elements, and performance indicator groups.

Presentation of the 3 main elements of the project photovoltaic, green roof and water management.

Presentation of the 3 main elements of the project photovoltaic, green roof and water management.

Scenario for future, cycle-oriented management of construction waste in Vienna (reference year 2014, material flows in t/a)

Scenario for future, cycle-oriented management of construction waste in Vienna (reference year 2014, material flows in t/a)

Floor and building area potentials (>550 m² floor area) per building block in Vienna.

Floor and building area potentials (>550 m² floor area) per building block in Vienna.

Simulation and visualization prototype

Simulation and visualization prototype

Prototype D - (offsetting) sliding window

Prototype D - (offsetting) sliding window

Prototype C - Swing window

Prototype C - Swing window