Terms of use: The pictures on this site originate from the projects in the frame of the programmes City of Tomorrow, Building of Tomorrow and the IEA Research Cooperation. They may be used credited for non-commercial purposes under the Creative Commons License Attribution-NonCommercial (CC BY-NC).

Combined building and plant simulation in real time

In a dynamic building simulation, the zones (rooms) are in contact with their surroundings and with the adjacent building components, the people, equipment and objects located in them. In the combined building and plant simulation, the dynamic interaction between building, plant and control is also taken into account. A building and plant simulation, adapted in real time to the actual weather conditions and current measurement data from the building, can help to optimize the control of the building services and thus reduce energy costs and increase user comfort.

Two Austrian demonstration building digital twin

In recent years, AEE INTEC has completed two projects for the development and initial implementation of a digital twin on real buildings in Austria. This digital twin is a detailed simulation model using IDA ICE software, which is compared in real time with measurement data from a real building. This creates a model that represents the real condition of the building and its building services at any given time. This model can then be used for automated fault detection or to optimize control systems. The aim is to reduce energy consumption and improve user comfort.

Annex 81 Policy Package

Graphic representation of the policy package of measures developed in Annex 81 to promote Data-Driven Smart Buildings.

Group picture of IETS Task 21 at the IETS Conference 2023

At the IETS conference from May 9-11, 2023 in Gothenburg, the subtasks and activities of IETS Task 21 were presented, and two key note presentations and two elevator pitches on the task were given.

Gruppenfoto IETS Task 21 Consortium Meeting in Graz

On April 9, 2024, a full-day meeting of IETS Task 21 took place in Graz. The meeting provided a valuable platform for exchanging insights and planning further steps for the successful implementation of the tasks within Task 21.

Graphic illustration of different terms from Zeilerbauer et al. (2024)

Figure from Zeilerbauer et al. (2024) (https://doi.org/10.1080/17583004.2024.2408285), which uses a use case to discuss different terms from the area of ​​Circular Carbon.

Vision of the Energy/Carbon Future of Upper Austria 2040

The figure shows the visualized vision developed by the Energy Institute at the JKU in coordination with the stakeholders, which represents possible energy and resource exchanges in 2040 in annual quantities.

Stand of the different baterry technologies (IEA 4E EDNA Task on Batteries).

This graphic shows the state of the art of different battery technologies. 14 types are organized according to their state of development. 10 are lithium-based batteries, the other 4 use various chemistry compositions (Zinc or carbon nano-tubes), or use new concepts to increase their capacity.

High-temperature storage tanks at 160 °C ensure heat supply at night

The solar process heating plant was built in 2023 by Azteq/Solarlite, is operated by ENGIE Spain and supplies heat to the Heineken Sevilla brewery. In addition to the parabolic trough solar area of 43,000 m² (30 MW thermal output), high-temperature storage tanks (8 x 200 m³) ensure a high solar share of 60-70%.

Final meeting of the IEA SHC Task 64 in Seville with a tour of Europe's largest solar process heat plant

The final meeting of the IEA SHC Task 64 took place in Seville. Europe's largest solar process heat plant was visited as part of the meeting. It was built in 2023 by Azteq/Solarlite, is operated by ENGIE Spain and supplies heat to the Heineken Sevilla brewery. In addition to the parabolic trough solar area of 43,000 m² (30 MW thermal output), high-temperature storage tanks (8 x 200 m³) ensure a high solar share of 60-70%.

Solar process heat system for Seville brewery

The solar process heating plant was built in 2023 by Azteq/Solarlite, is operated by ENGIE Spain and supplies heat to the Heineken Sevilla brewery. In addition to the parabolic trough solar area of 43,000 m² (30 MW thermal output), high-temperature storage tanks (8 x 200 m³) ensure a high solar share of 60-70%.

Solar process heat system for Seville brewery

The solar process heating plant was built in 2023 by Azteq/Solarlite, is operated by ENGIE Spain and supplies heat to the Heineken Sevilla brewery. In addition to the parabolic trough solar area of 43,000 m² (30 MW thermal output), high-temperature storage tanks (8 x 200 m³) ensure a high solar share of 60-70%.

Sonnenplatz Großschönau

Gesamtüberblick

Sonnenplatz Großschönau

Passivhaus

Sonnenplatz Großschönau

Passivhaus

Sonnenplatz Großschönau

Passivhaus

Arbeiterwohnanlage Felixdorf

vor der Sanierung

Arbeiterwohnanlage Felixdorf

nach der Sanierung

Wohnbau Utendorfgasse

Innenhof

Wohnbau Utendorfgasse

Balkone