Project Image Pool

There are 50 results.

Terms of use: The pictures on this site originate from the projects in the frame of the programmes City of Tomorrow, Building of Tomorrow and the IEA Research Cooperation. They may be used credited for non-commercial purposes under the Creative Commons License Attribution-NonCommercial (CC BY-NC).

Waste gasification in Lahti

100 kilometers north of Helsinki, Finland, in the city of Lahti, is the world’s first eco-gas fueled power plant. Lahti Energy’s Kymijärvi II power plant runs on SRF.The plant produces 50 MW of electricity and 90 MW of district heat for the city of Lahti. It was officially inaugurated in May of 2012.

The bioliq® pilot plant

The bioliq® pilot plant covers the complete process chain required for producing customized fuels from residual biomass. Power and heat als the by-products and cover the own demand of the facility. For energy densification of the biomass, fast pyrolysis is applied. The liquid pyrolysis oil and solid char obtained can be processed into intermediate fuels of high energy density. Fuel and chemicals production from syngas requires high pressures. Therefore, syngas production is already performed at pressures up to 80 bar by entrained flow gasification. Gas cleaning and conditioning are conducted at the same pressure at high temperatures allowing for optimal heat recovery and thus improved energy efficiency. In the bioliq® pilot plant the purified syngas is firstly converted into dimethyl ether and then further to gasoline.

Visit by Task 32 experts to Arbaflame (Norway)

As part of the task meeting in spring 2019, the experts from Task 32 visited the Arbaflame production site in Grasmo (Norway).

Steam Explosion plant of Arbaflame in Grasmo (Norway)

The ArbaOne plant in Grasmo, outside Kongsvinger, Norway, is the first large-scale commercial plant with an annual production capacity of 70,000 tonnes of steam-exploded pellets.

Thermally treated wood pellets

Thermally treated wood pellets (steam exploded) are used in a slightly adapted former coal-fired power plant in Thunder Bay (Canada) as a new climate-friendly fuel for electricity generation.

Visit of wood pellet power plant (240MW) in Canada

Plant visit at the 240MW Woodpellet-Powerplant of Ontario Power Generation in Atikoken Canada

IEA Bioenergy Task 32 Experts

IEA Bioenergy Task 32 experts visiting the bioenergy research laboratory at the Lucerne University of Applied Sciences in the frame of a task meeting in Switzerland

Biomass CHP in Västerås (Sweden)

Field trip of IEA BIoenergy Task 32 Experts to the CHP plant in Västerås operated by Mälarenergi in Sweden (close to Stockholm).

aspern IQ, Paneele Südostfassade

aspern IQ, Paneele Südostfassade

aspern IQ, Cafe

aspern IQ, Cafe

aspern IQ, Gesamtansicht von Westen

aspern IQ, Gesamtansicht von Westen

Advanced Biofuel Pathways

Principle pathways of advanced biofuels technologies

Research project "N.ICE"

The erection of the experimental setup for the research project N.ICE could be completed just in time before the start of the winter season. For the next months, a number of different samples of nano-structured surfaces will be tested under the harsh icing conditions of the Styrian mountains. N.ICE is a cooperative research project between the Vienna University of Technology and the Energiewerkstatt Verein, which is funded by the Austrian Climate and Energy Fund.

Rotor blade icing

Scenic view of a rotor blade with light snow and ice accumulation in a winterly setting.

International workshop on ice fall risk assessment in Salzburg

On November 4th and 5th 2021, the Energiewerkstatt invited to a workshop on ice fall risk assessment in the framework of Task 19 of the IEA research cooperation. The aim was to revise the international recommendations on ice fall and ice throw risk assessment issued on behalf of the IEA. The expert group led by Energiewerkstatt published the new edition of the document in spring 2022.

Template of a universal ice fall warning sign

In course of revising the IEA Wind TCP Ice Fall Recommendations the template of a universal ice fall warning sign was designed.

Poject meeting Salzburg

Participants in the Task 19 Workshop on risk analysis and risk assessment which was held in January 2018 in Salzburg.

Iced-up measurement

Severe icing on a meteorological measurement site. The sole instrument free of ice is the heated anemometer in the upper center of the picture.

IEA-PVPS Task Grid Integration workshop in Tokyo, Japan

International Experts from Task 14 and Experts from the Japanese electricity sector and research attending the NEDO/Task 14 workshop in November 2022

Tailem Bend Solar Power Farm, South Australia

187 MW Solar Power Farm in Tailum Bend, South Australia