Project Image Pool

There are 103 results.

Terms of use: The pictures on this site originate from the projects in the frame of the programmes City of Tomorrow, Building of Tomorrow and the IEA Research Cooperation. They may be used credited for non-commercial purposes under the Creative Commons License Attribution-NonCommercial (CC BY-NC).

Raw materials and gasification plant in Güssing

Wood chips serve as raw material for the gasification plant in Güssing

Biogas process monitoring

Biogas process monitoring with lab analysis

Biogas lab trials

Gas counter for biogas lab trials

Biogas plant with snow

Agricultural biogas pland during winter times

Task Meeting Seoul/Korea

Group foto of IEA Task 37

Group foto Task 37

Group foto of IEA Task 37

CHP biomass gasification facility in Frauenfeld

In Frauenfeld in Switzerland, the biggest SynCraft project was realised. it is 4xCW1800x2-1000 CHP facility, which delivers power and heat for about 8000 households as well as sugar-production factory and Frauenfeld town.

SynCraft - CHP in Ternitz

In September 2019 the construction of CHP facility CW1200-400 was started by company KWS Ökokraft GmbH. Despite Covid-pandemic the facility operation was started in July 2020.

Waste gasification in Lahti

100 kilometers north of Helsinki, Finland, in the city of Lahti, is the world’s first eco-gas fueled power plant. Lahti Energy’s Kymijärvi II power plant runs on SRF.The plant produces 50 MW of electricity and 90 MW of district heat for the city of Lahti. It was officially inaugurated in May of 2012.

The bioliq® pilot plant

The bioliq® pilot plant covers the complete process chain required for producing customized fuels from residual biomass. Power and heat als the by-products and cover the own demand of the facility. For energy densification of the biomass, fast pyrolysis is applied. The liquid pyrolysis oil and solid char obtained can be processed into intermediate fuels of high energy density. Fuel and chemicals production from syngas requires high pressures. Therefore, syngas production is already performed at pressures up to 80 bar by entrained flow gasification. Gas cleaning and conditioning are conducted at the same pressure at high temperatures allowing for optimal heat recovery and thus improved energy efficiency. In the bioliq® pilot plant the purified syngas is firstly converted into dimethyl ether and then further to gasoline.

Visit by Task 32 experts to Arbaflame (Norway)

As part of the task meeting in spring 2019, the experts from Task 32 visited the Arbaflame production site in Grasmo (Norway).

Steam Explosion plant of Arbaflame in Grasmo (Norway)

The ArbaOne plant in Grasmo, outside Kongsvinger, Norway, is the first large-scale commercial plant with an annual production capacity of 70,000 tonnes of steam-exploded pellets.

Thermally treated wood pellets

Thermally treated wood pellets (steam exploded) are used in a slightly adapted former coal-fired power plant in Thunder Bay (Canada) as a new climate-friendly fuel for electricity generation.

Visit of wood pellet power plant (240MW) in Canada

Plant visit at the 240MW Woodpellet-Powerplant of Ontario Power Generation in Atikoken Canada

IEA Bioenergy Task 32 Experts

IEA Bioenergy Task 32 experts visiting the bioenergy research laboratory at the Lucerne University of Applied Sciences in the frame of a task meeting in Switzerland

Biomass CHP in Västerås (Sweden)

Field trip of IEA BIoenergy Task 32 Experts to the CHP plant in Västerås operated by Mälarenergi in Sweden (close to Stockholm).

Advanced Biofuel Pathways

Principle pathways of advanced biofuels technologies

Modeled performance envelopes of rotor blade heating systems

Modeled performance envelopes as curves depending on wind speed and ambient temperature for different values of liquid water content (LWC) and surface temperature of the rotor blade. The curves were calculated with the “Task 54 Performance Envelope Model”.

Group picture of the Task meeting in Calgary

Group picture of the participants of the task meeting following the “Electricity Transformation Canada” conference in Calgary in October 2023.

Task presentations at stakeholder meeting of IG Windkraft

Ian Baring-Gould (NREL, Task 41) giving a presentation on distributed wind's role in supporting the clean energy transition. Further presenters in the panel from left to right: Franziska Gerber (Meteotest, Task 54), Charles Goudreau (Nergica, Task 54), Andreas Krenn (Energiewerkstatt), Claas Rittinghaus (Energiewerkstatt, Task 54).