Search Results
"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.
Operational and maintenance costs in passive houses and low energy houses
How much energy does a passive house actually save? Does a passive house pay-off by itself? What are the costs for maintancence? For the first time an approximation for the running costs of a passive house were systematically documented and compared.
LifeCycle Tower - Energy efficient prefabricated multi-storey timber houses
Based on the results of previous research projects, the project at hand deals with the development of a wooden prefabricated module construction for energy efficient office buildings with up to 20 storeys. This sustainable system ensures cost certainty through the whole life cycle of the building.
"gugler! build & print triple zero" - subproject 3: recyclable constructing
Development of basic principles and proposals for highly recyclable constructions. A catalogue with main principles of recyclable designing with a particular focus on material inherent bonding and joint techniques as well as a selection of constructions including ecological benchmarks, calculation of building physics plus costs was created.
"gugler! build & print triple zero" - Subproject 7: Integrated General Planning
The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.
Zero Carbon Village - energy autarcic settlement
Development and demonstration of a totally CO2 neutral and energy self sufficient residential area, produced in prefabricated straw bale constructions. The focus of the research is put on industrialized modular mass production of "Zero Carbon Houses", energy self sufficiency and the use of energy efficient and sustainable materials like straw.
Connection of innovative strategies and technologies to a holistic, resources-friendly plus energy building (FUTUREbase)
On the basis of a construction project in Giefinggasse 4 in Vienna the combination of new, innovative strategies and technologies to an integrated, resources conserving plus energy building with high signaling and multiplication effect had been tested for feasibility. A regional, energetical bond between the buildings TECHbase, ENERGYbase and the Klima-Windkanal had been developed.
ECR Energy City Graz-Reininghaus: Urban strategies for the new conception, construction, operation and restructuring of an energy self-sufficient city district
The aim is the development of a valid set of specific values and a guideline as a basis for energy self-sufficient district development. Based on the results, a masterplan (energy-network) for the district Graz-Reininghaus shall be developed. Future-oriented "city-building-blocks" will be implemented as flagships of innovation.
aspern + Vienna's Urban Lakeside - sustainable urban development
The focal points of the largest urban development project in Europe are the topics public space and microclimate as well as cross-building energy supply. Landmark projects will be implemented in the areas residential buildings, office/industry buildings and mobility.
Clay - Passiv Office-Building Tattendorf
The motivation for developing the project "Clay Passiv Office-Building Tattendorf" was the dissatisfaction with the situation of a great difference in the state of technology in three fields relevant to the research project: 1) sustainable production of energy , 2) sustainable energy conservation technologies and 3) use of sustainable building materials.
PEB - Plus-Energy-Office
An integrated technical energy plus office concept without additional building costs demonstrates the feasibility of such projects instancing a concrete office project with 50.000 m² floor area in Vienna with economical cost consideration.
aspern Vienna´s Urban Lakeside - subproject 6b: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern
The project deals wtih the energy consumption monitoring of demonstration buildings, which are erected within the framework of the landmark project "aspern+". As both, office/manufacturing as well as residential buildings will be constructed, these different user groups will have to be considered. The derivation of the concepts will be done in accordance of the specific needs of the individual demonstration buildings.
Effective Comfort in a Climatic comfort house
Sophisticated implementation of different passive house-building services systems on a basis of four similar parts of a structure of multi-storey dwelling houses.
Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings
The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.
S - House
Innovative Use of Renewable Resources demonstrated by means of an Office and Exhibition Building
OPEN LIVING PLUS - building structures and utilization options with high social functionality and plusEnergie-standard for rural regions
In small to medium sized communities in rural Regions there is a high demand for sustainable building and space for innovative living facilities, to satisfy the requirements of current and coming life designs. The project’s intentions were to provide social scientific groundwork, develop building structures and utilization options of high social functionality and to transfer knowledge to decision makers in communities and regional authorities.
Building of Tomorrow for the construction industry
Dissemination of results of the research initiative "Building of tomorrow" for two specific target groups - master builder and installer - implementation in further vocational training concepts
aspern Vienna´s Urban Lakeside - subproject 5: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern
Goal of the project is to develop a monitoring tool that allows to predict the expectable (final) quality of the residential buildings based on decisions made during the planning and construction phase. For this purpose, the current certification tool for the determination of "TQB-points" will be equipped with "interim" certifications, which shall allow the land developer to carry out a quality monitoring parallel to the construction phase. The tool will be tested with the data obtained from selected construction projects during the first residential development phase in seestadt aspern.
Evaluation of temperature differentiation on a room-by-room basis in passive house apartments
In the passive house Utendorfgasse a room–by-room temperature control was installed in 11 apartments. The experiences were evaluated from a technological and from a sociological point of view.
Comparative analysis and evaluation of innovative building concept models in terms of key ecological and economic figures during life cycle of individual building concepts
The aim of this research project was to subject a number of building concept models to a comprehensive comparative analysis and evaluation in terms of key ecological and economic figures.