Search Results
Evaluation of temperature differentiation on a room-by-room basis in passive house apartments
In the passive house Utendorfgasse a room–by-room temperature control was installed in 11 apartments. The experiences were evaluated from a technological and from a sociological point of view.
Comparative analysis and evaluation of innovative building concept models in terms of key ecological and economic figures during life cycle of individual building concepts
The aim of this research project was to subject a number of building concept models to a comprehensive comparative analysis and evaluation in terms of key ecological and economic figures.
Urban consolidation Lehen - Subproject 8a: project management - documentation - dissemination and quality assurance
The project coordinates several projects in the urban quarter Lehen to ensure increase of energy efficiency and sustainable development. This subproject contains the coordination of the partners and projects in order to reach defined standards of quality, coordination and cooperation with the program "Building of Tomorrow" and other flagship projects as well as the documentation of results.
oh 456 - Plus Energy Office Building oh456
The "oh456 Plus Energy Office Building" with its adjoining small hydro-electric power plant shall serve as a prototype for testing innovative technologies and also provide the companies residing in the building integral home surroundings comprising common break and leisure facilities. A wide public will have access to the building which will be a location for the most diverse events, exhibitions and lectures on climate protection as well as being a joint promotional platform for sustainable construction.
Office Building WKS - Plus Energy Office Building in Ernstbrunn
The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.
Possibilities of urban high-rise multi-storey buildings in a timber-frame method with target course eight or more floors
Research of urban high-rise multi-storey buildings in a timber-frame construction method. Fundamental clarification of the feasibility in relation to the supporting structure, fire prevention and security. SWOT analysis as well as economic, ecological research concerning sustainable design.
Pallets never pall - Development of the Pallet House to series-production readiness
The winning project "Pallet House" of the EU-wide competition GAU:DI in 2007 consists of 800 (used) pallets. It has been exhibited in a scale 1:1 at the Biennale in Venice 2008 and has been developed for mass production within this project. Therefore, two exemplary scenarios were developed: (temporary) construction at Vienna's Urban Lakeside in Aspern and the construction of a low-cost building in South Africa.
ECR Energy City Graz - subproject 3: +ERS - Plus Energy Network Reininghaus Süd
The multifunctional neighbourhood "+ERS - Plus Energy Network Reininghaus Süd" was realized within the urban planning area of Graz-Reininghaus. The project aims to optimize the energy concept of the single buildings as well as of the building cluster in order to achieve a plus-energy standard within the residential neighbourhood.
Exhibition "Architecture and Passive House Standard in Austria"
The aim of the exhibition is to show the compatibility of the building quality standard "Passive House-Standard" with the requirements of the best architectural design with well-chosen examples and explanations. In this way these Austrian cultural and technical achievements shall be made more public.
"gugler! build & print triple zero" - subproject 5: Ecoeffective building
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.
Timber Passive House at Mühlweg, 1210 Vienna
Low-rise housing with 70 units (200 residents) in solid wood plate construction designed to meet European passive building standards. Strategies for highly ecological and sustainable building within the economic constraints of social housing, Mühlweg, 1210 Vienna. Industrial pre-fabrication, ...
Stroh-Cert: certification, logistic and quality management for straw bale buildings
Certification of straw bales as insulating material, development of a straw bale logistic concept and a quality management system as strategic measures with the aim of the dissemination of straw bales as insulating material
Beacon of innovation gugler cross media, ecoeffective zero energy cross media enterprise featuring zero-emission, zero energy, zero waste
The aim of the flagship project is a new dimension of sustainability (cradle to cradle, ecoeffective zero energy enterprise) for business operation and building, which means zero emission, zero energy, zero waste. This will be shown on the basis of a beacon of innovation: Gugler GmbH, a modern sustainable media services enterprise (traditional print and new media) will extend their current building from about 2100 square meters and about 90 employees to about 5,000 square meters.
Passive house Kindergarten with an integrated therapeutical group
Applied passive house techniques with locally available materials for a public building using limited funds.
Living and Working in the Moosburg, the "community of education"
The design aims not only at creating comfortable living spaces and practical work environments, but at connecting these realms, thus providing a holistically attractive “living space”. A pilot project will be built on an appropriate site in the very core of Moosburg, neighbouring both the village square and the educational campus.
"gugler! build & print triple zero" - subproject 1: lead project management
The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management
Competition for prefabricated house producers to design types of attached houses
A competition for the builders of prefabricated houses provided new design-types of attached houses. The results have been awarded and published to encourage the participants to enter this segment of the market.
aspern Vienna´s Urban Lakeside subproject 8: Overall Project Management Landmark Project "aspern+"
The Overall Project Management of the "Leitprojekt" includes the handling and supervision of the sub-projects, the reporting to the programme management and additionally the preparation and distribution of relevant results. Beyond that the project management is responsible to highlight possible synergies within other projects and to - if necessary - include these within the next steps.
Multifunctional City Nucleus
Sustainable mixed-use utilization of urban commercial and industrial areas with a specific focus on energy-related aspects.
Modular and standardised passive houses in solid timber construction
Concerning to an accurate and adaptable construction of 2 to 4 storey solid timber houses with the characteristics of a passive house, a digital construction and dimension system will be developed. The system which contains standardised modular ecological detailed solutions enables an exact dimensioning and installation of passive houses by small carpentering companies.