Search Results
PEB - Plus-Energy-Office
An integrated technical energy plus office concept without additional building costs demonstrates the feasibility of such projects instancing a concrete office project with 50.000 m² floor area in Vienna with economical cost consideration.
Platform for Energy-Efficient Hospitals - ways to a higher energy-efficiency
The present project is based on the results of the project "The energy-efficient hospital: realistic departure points and identification of possible measures"
Build to satisfy: Modeling of user behavior in lowest and plus energy buildings: Consequences for building and comfort
Aim of the project was a better understanding and modeling of effects of user behavior on energy performance in office and service buildings, built with lowest energy building and plus-energy building techniques. The results support facility managers of office/service buildings and integrate gender and diversity issues.
Energy package Kolpinghaus / Eco-Suite Hotel
The Kolping association’s dormitory for pupils and students has been extended. The energy demand of the newly constructed Eco-Suite Hotel is minimized by use of highly efficient components (such as LED lighting). Locally available energy sources (waste water heat and sunlight) are used and an on-site energy system is being created for the use of the heat energy surplus. Guests at Eco-Suite Hotel can experience life in a plus energy building.
PH Office - Criterions for energy-efficient office buildings
The passive house standard and energy-efficient building technologies are getting increasingly important for office buildings, too. However, standardisation is not completed on the same level as known from the residential building sector. The project at hand brings in definitions and makes a suggestion on a standardised calculation method for office buildings in passive house quality.
Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings
The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.
S - House
Innovative Use of Renewable Resources demonstrated by means of an Office and Exhibition Building
COP5+ - Further development of a heat- and cooling system with seasonal heat storage at the example of Central Europe´s biggest geothermal depth drilling field
The aim was to increase the overall energy efficiency of Plus-Energy-Houses by making the heat excess of summer available for use in winter. This was carried out by improvements of the technology seasonal heat storage to an intelligent overall system. The biggest geothermal depth drilling field in Central Europe has been established.
BIGMODERN - Subproject 8: Demonstration building Amtshaus Bruck - Realisation
In the frame of the flagship project BIGMODERN the "Amtshaus Bruck an der Mur" had been renovated according to above-average quality standards concerning energy efficiency and sustainability while complying with an industrial management point of view.
win wi[e]n: block development ground floor zone: Optimization of the Viennese block renewal programm as a tool for a sustainable development of street level and open (public) spaces of urban fabric
Development of the Viennese Block Renewal Program with a special focus on the ground floor zone of historical urban fabric (on the basis of the case study Block Renewal Area Ilgplatz, Vienna): sustainable restructuring and reusing of the blocks at ground level, including courtyards and street spaces- as a comprehensive planning approach.
Network material ecology for hospitals
The use of sustainable building materials is a key issue for sustainable development of the building sector. Emission free indoor air, minimized embodied energy of construction materials and health risk for construction workers are three main aspects. Between five hospital operators in Austria, Germany and Switzerland a practical exchange of experience focused on material ecology will be initiated and moderated.
aspern Vienna´s Urban Lakeside - subproject 3a: Technology Centre aspern IQ
The demonstration project "Technology centre aspern IQ" showed that the energy required for space conditioning (heating, cooling, ventilation, lighting, hot water) can be covered from domestic energy production.
BIGMODERN - Sustainable refurbishment standards of federal buildings constructed between 1950 and 1980
The project aims at developing sustainability and climate protection criteria for the refurbishment of federal buildings of the postwar period. These criteria will be tested for their practical suitability within the framework of demonstration projects. Subsequently, these criteria will be defined as fundamental guiding principles in the planning and building processes for all future BIG retrofit projects.
"gugler! build & print triple zero" - subproject 4: energy concept Gugler
The energy concept led Gugler in frame of the conversion and expansion of the company towards plus-energy standard. Significant measures ware a consequent maximum reduction of the energy demand, optimal utilisation of industrial waste-heat, maximum consumption of on-site energy sources, integrated energy production, ecologic load management with comprehensive response- and storage-techniques.
Energy relevant and ecological monitoring studies of demonstration buildings, which were built in the framework of the program "Haus der Zukunft".
Energy relevant and ecological monitoring studies of demonstration buildings, which were built in the framework of the program "Haus der Zukunft". The user acceptance should also be levied and displayed
ArcheNEO - an energy-autonomous office park in Kitzbühel
ArcheNEO is a highly energy efficient office park, that produces more energy than it needs. It features an integrated energy concept that saves energy, uses renewable energies in combination with electric mobility and batteries as electricity storage and manages energy and was planned and built in Kitzbühel Oberndorf. The demonstration object will be multiplied and exported.
BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability
The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.
ProKlim+ - Use of Model Predictive Control to optimize solar power consumption in case of increased energy efficiency.
Using weather forecast for building automation can help improving the energy efficiency of buildings and, thus, saving energy. In the project ProKlim+ the forecast of solar radiation will be used to optimize the building automation to satisfy the needs of the building users, and at the same time to minimize the energy demand on the one hand and to maximize the consumption of self-produced energy on the other hand.
Demonstration project LifeCycle Tower - batch-produced energy efficient timber/hybrid high-rise building system
The energy efficient building concept shall be tested with regard to its functional efficiency and real usage conditions. The demonstration project is based upon the results of previous research activities and shall be presented to a wider public. It shall illustrate the advantages of a batch-produced timber/hybrid high-rise building system which offers high quality of energy and resource efficiency.
BIGMODERN - Subproject 5: Feasibility studies about innovative technical solutions
The application of innovative technologies means additional planning and coordination effort which usually cannot be incorporated into the conventional planning processes of the BIG. To overcome these barriers for the application of innovative technologies, the sub project at hand aims at preparing information, feasibility studies, planning records, experiences and practical examples in a way, that they can be implemented directly into the planning process.