Search Results
Energy Plus House Weber - highest energy efficiency in the tension between tradition and modernity
The tension between tradition and modernity is shown and exemplarily solved on the example of the historic farmhouse "vulgo Weber". The object was converted into an energy plus house with an exceptionally holistic approach and also thought as a demonstration object for a broad public through the touristic use of the house.
"gugler! build & print triple zero" - subproject 5: Ecoeffective building
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.
Urban consolidation Lehen
The key project "Stadtumbau Lehen" ("urban consolidation Lehen") coordinates several projects at the urban district of Lehen, with the purpose of the raise in energy efficiency and safekeeping of a sustainable development. Four builder (ten teams of architects), two scientifically institutions, the town of Salzburg and two attended departments of the land are working together.
Construction Site SCHOOL - Sustainable Models for the Refurbishment of School Buildings?
In this research project, models for refurbishment and restructuring of school buildings were developed. The reconstruction concepts contain lists of measures for deploying sustainable building techniques and exemplary case studies for the reorganisation of buildings of different typologies.
e80^3-Buildings - Sub project 2: Concept development
Based on the selection of suitable demonstration projects in Subproject 1 an innovative concept for passive and active building envelopes and energy supply of so called "Plus Energy Buildings" (renovation) has been developed.
Gründerzeit with future: Innovative Modernisation of Wilhelminian style "Gründerzeit" Buildings
This flagship project is focusing on buildings from the late 19th and early 20th century ("Gründerzeit") with typically decorated façades.
Integration of results of the program "Building of Tomorrow" into the established qualification program of energy counsellors and their daily consultancy activities
Preparing the results of the "Building of Tomorrow" program for energy counsellors by elaborating a material collection and integrating it into the basic education of energy counsellors. Furthermore a one-day training course for already active energy counsellors will be designed and held.
Plus energy office building - Subproject 3: Austria's biggest plus energy office building
In course of the refurbishment of the Vienna University of Technology (Univercity 2015) Austria´s biggest plus energy office building is going to be built. This project intends to demonstrate not only the technical but furthermore the economical feasibility of plus energy office buildings. Within this building the plus energy concept is fulfilled by optimizing the power consumption of the whole building and the installation of Austria´s largest facade integrated photovoltaic plant.
ThermSat - pilot training program "Thermal renovation engineer in construction industry"
The goal was to design, offer, evaluate and refine a practical training, adapted to the current development. Aim of the courses is to have well-trained engineers and technicians with practical and theoretical knowledge in the field of thermal renovation of buildings.
IDsolutions - Solutions for the refurbishment within existing building stock with interior insulation
The refurbishment of existing building stock demands solutions within single units. Interior insulation is a suitable technology. The challenge is to bring multiple demands and requirements together to create optimal solutions. Therefore it's necessary to arrange individual system components to form working model refurbishment solutions. The development of such solutions is the aim of the project. Not only durability and quality is to be ensured, but also user acceptance. Increasing the rate of refurbishments is the overall aim of the project.
BIGMODERN - Subproject 11: Dissemination of project results
The project is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups, such as decision makers inside the BIG Bundesimmobiliengesellschaft, various users of federal buildings and other real estate companies nationally and internationally.
SQUARE - A System for Quality Assurance when Retrofitting Existing Buildings to Energy Efficient Buildings
The project aims to promote a flexible quality assurance management for the retrofitting process. It leads to high quality renovations of residential multifamily buildings regarding energy improvement and improvement of indoor environment.
Gründerzeit with future - demonstration project 3: KA 7 Kaiserstraße - Innovative renovation of a listed Gründerzeit building
A demonstration of how innovative measures, with highly efficient and contemporary standards and taking into consideration comfort and energy consumption, can be applied to a heritage listed building.
Gründerzeit with future - demonstration project 2: ROOFJET Wißgrillgasse - sustainable solution for improving the thermal-energetic performance of a typical historical building in Vienna
The main aim of the project ROOFJET Wißgrillgasse is a building refurbishment by a factor of 8 which demonstrates that even historical buildings can be refurbished to lowest energy standard.This demonstration project shows a holistic and sustainable refurbishment concept for a special type of buildings with innovative technical and organizational solutions.
Gründerzeit with future - subproject 5: Documentation and monitoring
The main aim is the documentation and monitoring of the demonstration projects within the scope of the project "Historical buildings of tomorrow" with regard to the technical implementation, investment and operation costs and to the energetic performance. All demonstration projects will be accompanied by an evaluation process regarding occupants' satisfaction and the refurbishment process. Beyond that, legal constraints for innovative refurbishment of historical buildings will be documented and proposals for adaptations of the rental law and refurbishment subsidy schemes will be developed.
"gugler! build & print triple zero" - subproject 3: recyclable constructing
Development of basic principles and proposals for highly recyclable constructions. A catalogue with main principles of recyclable designing with a particular focus on material inherent bonding and joint techniques as well as a selection of constructions including ecological benchmarks, calculation of building physics plus costs was created.
BIGMODERN Subproject 7: Monitoring concept
Development of a pattern for comprehensive documentation of the project results. The concepts contain amongst others monitoring of energy consumption, resources, costs, functionality and comfort, etc.
ECR Energy City Graz-Reininghaus: Urban strategies for the new conception, construction, operation and restructuring of an energy self-sufficient city district
The aim is the development of a valid set of specific values and a guideline as a basis for energy self-sufficient district development. Based on the results, a masterplan (energy-network) for the district Graz-Reininghaus shall be developed. Future-oriented "city-building-blocks" will be implemented as flagships of innovation.
Renew Building - Competence Building and Knowledge Transfer for Climate-friendly renovation with ecological and renewable materials
The project Renew Building provided knowledge about eco-friendly renovation to the target groups (planners, architects, students of architecture, etc.) through theory and practice classes, lectures, an e-learning platform, and in an online knowledge database.
Certified passive attic conversion of a typical building from the period around 1900
Conversion of an attic of a typical building from the period about 1900 to a passive attic with photovoltaic system and renovation of the existing building equipment. The aim is to keep the additional construction costs under 10 %, to avoid overheating in summer and to make possible a reproduction for the large amount of buildings from the same period.