Search Results

Haus der Zukunft

From courtyards to lightyards

The feasibility of daylight-optimized solutions for retrofitting courtyards by an intelligent alignment of different materials has been examined. With it, daylighting levels in lower floors can realistically be increased tenfold. Additionally, a calculation tool for generating and evaluating optimal courtyard solutions was designed. Besides daylighting parameters also economic criteria were considered.

Stadt der Zukunft

E.Vent – Efficient, cost-effective and low-maintenance central ventilation systems for multi-family housing – Design, operation and fire protection measures

Die Synopsis ist eine drei- bis vierzeilige Beschreibung des Projektinhalts alsErgänzung zum Titel und nähere Erläuterung des Projekts.

Stadt der Zukunft

BONSEI! Optimal use of existing buildings – energy efficient implementation of renovation!

The project BONSEI! would like to support an energy efficient and socially acceptable densification of privately owned residential buildings in urban space and to develop a methodological basis for resource efficient urban areas. The results are used for the conception of an innovative service in order to provide a neutral consulting regarding private densification plans.

Haus der Zukunft

THERM-opti-BALCONY: Thermal Optimized Renovation of Balconies

Pre-cast cantilever balconies represent a particular problem in the thermal renovation of buildings. The central goal of this project is the development of practical and cost-effective mounting solutions for the thermally decoupled reconstruction of balconies on building frontages and achieving a significant increase in the energy performance of the thermal renovation measure.

Haus der Zukunft

THERM-opti-BALCONY-P2 - Thermal Optimized Renovation of Balconies Phase 2: In-Situ-Pilot-Station

Pre-cast cantilever balconies represent a particular problem in the case of thermal rehabilitation of buildings. With the THERM-opti-BALKON-System a solution is currently being investigated under laboratory conditions. Phase 2 aims to create an in-situ-pilot-station. The most important object of study is the long-term behavior of the THERM-opti-BALKON-System.

Stadt der Zukunft

SPIDER - Subtraction as a measure to Preserve and Insulate historic Developments by Electric Robots

The purpose of this exploration is to unlock the potential of autonomous, data-driven robots that achieve improvements of the thermal building performance through air entrapments in a continuous process.

Stadt der Zukunft

VAMOS - Casement windows with vacuum glazing: Performance-Monitoring for Building retrofit

Knowledge consolidation of the exploratory project VIG_SYS_RENO; This project focused on the application of vacuum glass in existing casement windows for purposes of energetic performance improvement of buildings. Expected results include new insights about and a guideline for the application and utilization of vacuum glass products in existing window systems.

Stadt der Zukunft

Innovation lab act4energy

The Innovation Lab act4energy is set up as an innovation laboratory project. Its focus is to solve the problems of renewable energies integration with a focus on photovoltaic power paired with local consumption, linked to the the high fluctuation of renewable energies.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 6: Integration of the C2C production into the flagship project Gugler

Print and media production at the media and communications company gugler GmbH are currently being optimized according to Cradle to Cradle (C2C) criteria. The goal of this subproject is to allow the demands of a C2C production process optimized for exchange with biological cycles to be included into the general planning of the new production building of the company, a pilot project within the "building of tomorrow" program line.

Haus der Zukunft

Renovation with passive house technology by master-builder – verified planning documentation – Guide and seminars

The project aims at an increased implementation of passive house technology by the planning as well as the operating master-builder.

Haus der Zukunft

BIGMODERN - Subproject 2: Demonstration project of an official building in Bruck

In the frame of this subproject being part of the flagship project BIGMODERN, a decision matrix as well as a handbook for planning, including feasibility analysis and a collection of information, serving as decision guidance for planning and implementation of sustainable building refurbishment, is being developed. In this way, the risk for planners and builders of the usage of new sustainable technologies shall be minimised.

Haus der Zukunft

Ecological restoration of a listed building with passive house technologies

Ecological exemplary reconstruction of the "Haidenhof"-building, Bad Ischl, Upper Austria. Building refurbishment with respect to monumental protection and newest passive house technologies. Reorganisation of the former residential building to an academy of arts and culture.

Haus der Zukunft

Energy Plus House Weber - highest energy efficiency in the tension between tradition and modernity

The tension between tradition and modernity is shown and exemplarily solved on the example of the historic farmhouse "vulgo Weber". The object was converted into an energy plus house with an exceptionally holistic approach and also thought as a demonstration object for a broad public through the touristic use of the house.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 5: Ecoeffective building

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.

Haus der Zukunft

Urban consolidation Lehen

The key project "Stadtumbau Lehen" ("urban consolidation Lehen") coordinates several projects at the urban district of Lehen, with the purpose of the raise in energy efficiency and safekeeping of a sustainable development. Four builder (ten teams of architects), two scientifically institutions, the town of Salzburg and two attended departments of the land are working together.

Haus der Zukunft

Construction Site SCHOOL - Sustainable Models for the Refurbishment of School Buildings?

In this research project, models for refurbishment and restructuring of school buildings were developed. The reconstruction concepts contain lists of measures for deploying sustainable building techniques and exemplary case studies for the reorganisation of buildings of different typologies.

Haus der Zukunft

e80^3-Buildings - Sub project 2: Concept development

Based on the selection of suitable demonstration projects in Subproject 1 an innovative concept for passive and active building envelopes and energy supply of so called "Plus Energy Buildings" (renovation) has been developed.

Haus der Zukunft

Gründerzeit with future: Innovative Modernisation of Wilhelminian style "Gründerzeit" Buildings

This flagship project is focusing on buildings from the late 19th and early 20th century ("Gründerzeit") with typically decorated façades.

Haus der Zukunft

Integration of results of the program "Building of Tomorrow" into the established qualification program of energy counsellors and their daily consultancy activities

Preparing the results of the "Building of Tomorrow" program for energy counsellors by elaborating a material collection and integrating it into the basic education of energy counsellors. Furthermore a one-day training course for already active energy counsellors will be designed and held.

Haus der Zukunft

Plus energy office building - Subproject 3: Austria's biggest plus energy office building

In course of the refurbishment of the Vienna University of Technology (Univercity 2015) Austria´s biggest plus energy office building is going to be built. This project intends to demonstrate not only the technical but furthermore the economical feasibility of plus energy office buildings. Within this building the plus energy concept is fulfilled by optimizing the power consumption of the whole building and the installation of Austria´s largest facade integrated photovoltaic plant.