Search Results

Haus der Zukunft

Biomimetic potentials - Interdisciplinary identification and preparation of innovative biological inspired key technologies for "Plus-energy buildings of the future"

Experts from various branches of industry and research as well as bionics representatives worked out innovative ideas regarding "Key technologies for Plus-Energy-Buildings". The results provide a collection of emergent bionic research potential for the implementation of innovative research in the Austrian building sector.

Haus der Zukunft

Smart ABC Smart Energy Efficient Active Buildings and Building Clusters

The EPBD recast 2010 targeted "nearly zero energy buildings". This low amount of energy is to be covered by energy from renewable energy sources. The project "Smart ABC" analysed a variety of relevant solution sets regarding the building performance and the renewable based energy supply options. Energetic and ecological impacts were analyzed in order to optimize the integration of renewable energy technologies in building standards and to find answers how to depict a building cluster regarding standards and tools.

Haus der Zukunft

LifeCycle Tower - Energy efficient prefabricated multi-storey timber houses

Based on the results of previous research projects, the project at hand deals with the development of a wooden prefabricated module construction for energy efficient office buildings with up to 20 storeys. This sustainable system ensures cost certainty through the whole life cycle of the building.

Haus der Zukunft

Connection of innovative strategies and technologies to a holistic, resources-friendly plus energy building (FUTUREbase)

On the basis of a construction project in Giefinggasse 4 in Vienna the combination of new, innovative strategies and technologies to an integrated, resources conserving plus energy building with high signaling and multiplication effect had been tested for feasibility. A regional, energetical bond between the buildings TECHbase, ENERGYbase and the Klima-Windkanal had been developed.

Haus der Zukunft

ECR Energy City Graz - subproject 2: Framework-Plan Energy City Graz-Reininghaus

Main project-issue is the scientific work and the demonstration of the vision of the energy self-sufficient, CO2-neutral city-district Graz-Reininghaus. The Framework-Plan Energy City Graz-Reininghaus shall stimulate an awareness-raising process towards energy-efficient and sustainable city-development.

Haus der Zukunft

e80^3-Buildings - Sub project 3: Development of technology and components

The main objective of the key project "e80^3" was to develop high-performance renovation concepts focusing on plus-energy-buildings. Afterwards these concepts were realized in at least one or two demonstration-projects.

Haus der Zukunft

Certified passive attic conversion of a typical building from the period around 1900

Conversion of an attic of a typical building from the period about 1900 to a passive attic with photovoltaic system and renovation of the existing building equipment. The aim is to keep the additional construction costs under 10 %, to avoid overheating in summer and to make possible a reproduction for the large amount of buildings from the same period.

Haus der Zukunft

PHplusCAD, IT-based efficient Passive house- and Plusenergy house-Planning

Elaboration and programming of a software that reduces effort and time consumption of Passive house and Plusenergy house planning. By developing direct interfaces between CAD-applications and PHplusCAD and interfaces between PHplusCAD and Passivhouse planning tools based on MS Excel the system could be improved and the related working processes alleviated.

Haus der Zukunft

PEB - Plus-Energy-Office

An integrated technical energy plus office concept without additional building costs demonstrates the feasibility of such projects instancing a concrete office project with 50.000 m² floor area in Vienna with economical cost consideration.

Haus der Zukunft

plusFacades - International know-how- and knowledge transfer of "intelligent Facade systems" for Austrian players and key personnel

The project proceeds from the idea that prefabricated intelligent facade systems represent a promising technology for the energy efficient refurbishment of buildings. A goal is to process the present international state-of-the-art and the existing know-how to this topic for Austrian experts.

Haus der Zukunft

Energy package Kolpinghaus / Eco-Suite Hotel

The Kolping association’s dormitory for pupils and students has been extended. The energy demand of the newly constructed Eco-Suite Hotel is minimized by use of highly efficient components (such as LED lighting). Locally available energy sources (waste water heat and sunlight) are used and an on-site energy system is being created for the use of the heat energy surplus. Guests at Eco-Suite Hotel can experience life in a plus energy building.

Haus der Zukunft

e80^3-Buildings - Sub project 1: Basics

Goal of this subproject was to select the building with the highest potential within a building-portfolio. Therefore a criteria catalogue was developed, which is generally applicable.

Haus der Zukunft

Catalogue of Passivhouse Details for Refurbishments

A Catalogue of Passivhouse Details for Refurbishments for buildings of all building periods from the 1870 to the 1980s. Special consideration to the refurbishment of building parts in contact with the earth. Integration of controlled ventilation services. Construction elements description with drawings, building physical data and ecological life cycle assessment. This project aimed at contributing to "Replicable refurbishment concepts for meeting passive house (or comparable) standard in buildings of all building periods".

Haus der Zukunft

Monitoring Sunhouse Eferding

In course of the monitoring project the effectiveness of the energy-technical system was checked on the basis of running measuring data. The data were evaluated and, if required, the arrangements and settings of the control system were adapted. Main result is that the energy balance could have been improved explicitly whilst the monitoring process.

Haus der Zukunft

COP5+ - Further development of a heat- and cooling system with seasonal heat storage at the example of Central Europe´s biggest geothermal depth drilling field

The aim was to increase the overall energy efficiency of Plus-Energy-Houses by making the heat excess of summer available for use in winter. This was carried out by improvements of the technology seasonal heat storage to an intelligent overall system. The biggest geothermal depth drilling field in Central Europe has been established.

Haus der Zukunft

Buildings of highest energy-efficiency with integrated renewable energy development

For the future supply of energy services the combination of energy efficiency, energy storage and decentralized use of renewable energy in buildings offers itself. The project identified dynamic potentials of possible active and passive energy yields of construction units with use of renewable energy sources, pointed future solutions to energy-efficient and ecological design of building construction-units and united all results to a signpost: From today's passive house to the energy-plus-house of the future.

Haus der Zukunft

oh 456 - Plus Energy Office Building oh456

The "oh456 Plus Energy Office Building" with its adjoining small hydro-electric power plant shall serve as a prototype for testing innovative technologies and also provide the companies residing in the building integral home surroundings comprising common break and leisure facilities. A wide public will have access to the building which will be a location for the most diverse events, exhibitions and lectures on climate protection as well as being a joint promotional platform for sustainable construction.

Haus der Zukunft

Office Building WKS - Plus Energy Office Building in Ernstbrunn

The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.

Haus der Zukunft

Pallets never pall - Development of the Pallet House to series-production readiness

The winning project "Pallet House" of the EU-wide competition GAU:DI in 2007 consists of 800 (used) pallets. It has been exhibited in a scale 1:1 at the Biennale in Venice 2008 and has been developed for mass production within this project. Therefore, two exemplary scenarios were developed: (temporary) construction at Vienna's Urban Lakeside in Aspern and the construction of a low-cost building in South Africa.

Haus der Zukunft

OEKOPLUS-KOMPLEX - Analysis of the technical, economical and ecological preconditions for the establishment and utilisation of plus-energy-buildings and building assemblies

The evolution of the low energy house and the passive house standards to the plus energy standard results in a clear reduction of green house gas emissions as well as the primary energy input. The goal of the project was the determination of the technical, ecological and economic basic conditions for the construction and the use of "plus-energy-buildings" in order to finally realize them.