Search Results
Optimisation of ecological construction components for industrial serial production of precast elements
The project focused on passive house elements from straw and clay. Special interest was paid at a novel straw insulation as well as at an efficient drying process of the clay. Sustainability of the building materials was a very important aspect within the project.
First remediation of already existing homes to passive house standard with Vacuum insulated panels (VIPs)
Demonstration of the way to redevelop a home of the 19th century to passive house standard in consideration of moisture process and the use of vacuum insulation.
Kierling passive house - heading into the future sustainably
Using the example of demonstrational renovation, Kierling (built between 1977 and 1979) tests the possibilities of a renovation in passive house standard in technical, organizational and financial terms as an outstanding example of a comprehensive renovation.
Serial refurbishment for buildings in timber construction
Refurbishment of single- and two-familiy houses in timber construction in Austria has a large CO2-saving potential. To meet the special requirements for the refurbishment of timber constructions, a concept for the renovation to passive house respectively plus-energy house standard with special focus on ecologic construction materials was developed in this project.
WHISCERS. Whole House In-Situ Carbon & Emission Reduction Solution
Whiscers is a system for installing internal wall insulation with minimal mess, whilst the resident remains in the property. It involves measuring the walls in the property using a laser device that enables fast and highly accurate measurement. Information is then sent electronically to a computer controlled off-site cutting machine that is rapid, precise and mess-free.
e80^3-Buildings - Sub project 4: Demonstration object
Alongside the realisation of the plus energy building in Kapfenberg, a demonstration project is scheduled to be created that accomplishes an economically viable and technically innovative solution for the future.
Can sustainable building be realized at reasonable costs?
At the development "residential Passive House Utendorfgasse" were reached very low building costs. Would there be different building costs by using ecological materials and technologies? There will be calculated additional and reduced costs by using the ecological building-catalogue and internal characteristic values of projects that are similar in design.
aspern + Vienna's Urban Lakeside - sustainable urban development
The focal points of the largest urban development project in Europe are the topics public space and microclimate as well as cross-building energy supply. Landmark projects will be implemented in the areas residential buildings, office/industry buildings and mobility.
Analysis and evaluation of structural additional costs for passive house projects
Structural extra costs of passive houses decide whether these will become accepted at the market. Within the project the costs of several "Building of tomorrow" passive houses were compared. The results enable estimations for future passive house projects.
Competition for prefabricated house producers to design types of attached houses
A competition for the builders of prefabricated houses provided new design-types of attached houses. The results have been awarded and published to encourage the participants to enter this segment of the market.
Operational and maintenance costs in passive houses and low energy houses
How much energy does a passive house actually save? Does a passive house pay-off by itself? What are the costs for maintancence? For the first time an approximation for the running costs of a passive house were systematically documented and compared.
Renovation of the "Gründerzeit" building Eberlgasse in passive house standard
Based on the latest available technical capabilities, the renovation of Eberlgasse 3 will show that passive house standard is achievable even in a typical 19th century building.
ECR Energy City Graz - subproject 3: +ERS - Plus Energy Network Reininghaus Süd
The multifunctional neighbourhood "+ERS - Plus Energy Network Reininghaus Süd" was realized within the urban planning area of Graz-Reininghaus. The project aims to optimize the energy concept of the single buildings as well as of the building cluster in order to achieve a plus-energy standard within the residential neighbourhood.
Gründerzeit with future - sub project 2: Foundations and feasibility studies
Documentation of available knowledge on the renovation of historical buildings ("Gründerzeitgebäude") as an input for the preparation of 5 demonstration projects as well as the development of an accompanying monitoring system within the scope of the project "Gründerzeit with future".
Sol2Pump - High efficient combination of solar thermal plants, photovoltaic and heat pumps
Targeting a high level of decentralised energy supply on basis of renewable energy, the project analysed the possible combinations of solar thermal energy, photovoltaic and heat pumps. The project aimed to maximise the domestic energy supply due to utilisation of the building as short term energy storage. In addition to that, several optimisation measures had been developed. The impact on the energy supply and demand will be economically assessed through life cycle costing. On this basis, the potential load transfer and the use of this kind of systems had been evaluated in combination with smart grids.
CombiSol: solar combisystems for houses, state-of-the-art and potentials for improvements
Evaluation of the quality and efficiency of state-of-the-art installed solar combisystems, potentials for improvements and measures to increase the quality
OPEN LIVING PLUS - building structures and utilization options with high social functionality and plusEnergie-standard for rural regions
In small to medium sized communities in rural Regions there is a high demand for sustainable building and space for innovative living facilities, to satisfy the requirements of current and coming life designs. The project’s intentions were to provide social scientific groundwork, develop building structures and utilization options of high social functionality and to transfer knowledge to decision makers in communities and regional authorities.
Passivhauswohnen³: Facility Management for Residential Property Developers: A Key to Optimizing the Reduction of Energy and Operation Costs
What soon will be considered "standard" in ecological building must be carried out by the property developer and accepted by the future user. Therefore, in order to assist a smooth implementation of the new passive housing technique and begin the corresponding feedback mechanisms, a specific KMU "quality and incentive model" should be launched. The interrelationship of this model is designed with the property developer as well as the user in mind and aims for lasting "behavior modification" in energy and operational expense consumption.
Energy relevant and ecological monitoring studies of demonstration buildings, which were built in the framework of the program "Haus der Zukunft".
Energy relevant and ecological monitoring studies of demonstration buildings, which were built in the framework of the program "Haus der Zukunft". The user acceptance should also be levied and displayed
Development of a strategy for industrialized serial production of ecological passive houses made out of renewable resources
Development of a strategy for industrialized seria. production of ecological passive solar houses made out of building materials based on renewable resources as foundation for the dissemination of sustainable solutions for the production of prefabricated houses and of single houses.