Search Results
Energy relevant and ecological monitoring studies of demonstration buildings, which were built in the framework of the program "Haus der Zukunft".
Energy relevant and ecological monitoring studies of demonstration buildings, which were built in the framework of the program "Haus der Zukunft". The user acceptance should also be levied and displayed
thermocollect: realisation of a plus energy building by a solar active facade system
The project demonstrates the application of a solar active facade system in the course of the renovation of an existing building in order to achieve the plus-energy standard. Moreover, the effectiveness of the system will be demonstrated on new buildings and transparent components as well. The final outcome will be a manual for the application and implementation of the façade system focusing on the segment of specialists and skilled labour.
Sol2Pump - High efficient combination of solar thermal plants, photovoltaic and heat pumps
Targeting a high level of decentralised energy supply on basis of renewable energy, the project analysed the possible combinations of solar thermal energy, photovoltaic and heat pumps. The project aimed to maximise the domestic energy supply due to utilisation of the building as short term energy storage. In addition to that, several optimisation measures had been developed. The impact on the energy supply and demand will be economically assessed through life cycle costing. On this basis, the potential load transfer and the use of this kind of systems had been evaluated in combination with smart grids.
Innovation and Sustainability in the Construction and Housing Sector
Concepts for enhancing in-house innovation in construction; development of performance and benchmarking indicators in the housing sector. Economic proposals to improve legal and structural business environment and to increase sustainable and energy efficient construction and renovation activities.
First remediation of already existing homes to passive house standard with Vacuum insulated panels (VIPs)
Demonstration of the way to redevelop a home of the 19th century to passive house standard in consideration of moisture process and the use of vacuum insulation.
Passivhauswohnen³: Facility Management for Residential Property Developers: A Key to Optimizing the Reduction of Energy and Operation Costs
What soon will be considered "standard" in ecological building must be carried out by the property developer and accepted by the future user. Therefore, in order to assist a smooth implementation of the new passive housing technique and begin the corresponding feedback mechanisms, a specific KMU "quality and incentive model" should be launched. The interrelationship of this model is designed with the property developer as well as the user in mind and aims for lasting "behavior modification" in energy and operational expense consumption.
Refurbishment of a housing complex to passive-house standard, Graz - Dieselweg
Refurbishment of the former "Puch-Siedlung", built as a housing area for employees of the company "Puch", in Graz Liebenau, in the period from the 1950s to 1970s, as an exemplary model for a refurbishment in "passive house standard" with special thoughtfulness to the tenants. "From domestic fuel to solar self sufficiency"
Energy efficient, resource conserving and differentiated renovation of historic European building stocks (ReCoRe)
The project goal was the development of an integrated, long term and life cycle oriented approach to sustainable modernisation of historical building stocks. Within this project the partners used common objectives and planning tools and followed a common procedure in order to develop a specific national application which results from a historical, technical, social and cultural understanding of the specific national stock fragments.
Analysis and evaluation of structural additional costs for passive house projects
Structural extra costs of passive houses decide whether these will become accepted at the market. Within the project the costs of several "Building of tomorrow" passive houses were compared. The results enable estimations for future passive house projects.
Refurbishment of an existing villa of the "Gründerzeit" to passive house standard with passive and active solar use
The project shows in an exemplary way how buildings of the time of "Gründerzeit" could be maintained and could offer a better environmental balance including the view of the village and the traffic than a new building. As an example a villa has been converted into a multi-family house within a larger housing project.
Renovation of the "Gründerzeit" building Eberlgasse in passive house standard
Based on the latest available technical capabilities, the renovation of Eberlgasse 3 will show that passive house standard is achievable even in a typical 19th century building.
Strategy development for (technical / economical feasibility of) energy autarcic buildings
Development of a strategy for energy autarcic buildings with appropriate Technology solutions.
openVALUE - Quality and Weight of Open Spaces of Urban Building Projects
Based on four case studies the comprehensive contribution of open space to the increase of quality in real estate development was presented and provides the basis for the development of application oriented measures of quality management and strategies for innovative solutions.
Development of affordable building equipment and services for future "Energy Plus houses" (Plus-Hybrid)
"Plus-Hybrid" integrates knowledge and experience from current activities and complement them by adopting a holistic approach, considering the intelligent interconnection of components as well as managing the planned efforts and human resources in time. The goal of this project was to develop affordable building equipment and services for future "Energy Plus houses".
Kierling passive house - heading into the future sustainably
Using the example of demonstrational renovation, Kierling (built between 1977 and 1979) tests the possibilities of a renovation in passive house standard in technical, organizational and financial terms as an outstanding example of a comprehensive renovation.
"Communal living for elderly - ecological, social and economical aspects" - eco-com.60+
The research project examined different forms of communal living of elderly people and contributes to the development of new, common forms of living for the elderly. Questions concerning demographic change and economic as well as ecologic challenges of our time had been dealt with.
Einfach:wohnen, integrated concept for multi-storey residential buildings
The aim of the project is to create a base for future social residential housing projects, for further projects and the development of standards in the field of passive and low energy houses.
KoPro Lzk+ - Cost and process optimization in the life cycle of nearly zero energy buildings
The aim of the project was to develop a continuous process chain for the energetic-economic optimization of zero and plus energy buildings. The project focused on proven and new approaches to cost reduction of nearly zero energy buildings (nZEBs) at all stages of the life cycle. The main goal was to identify the extra-costs for nZEBs, and to promote innovative approaches taking into account the cost-effectiveness for all the Stakeholders. A database containing important cost parameters and potential savings will be developed.
SaLüH! Renovation of multi-family houses with small apartments, low-cost technical solutions for ventilation, heating and hot water
New innovative concepts for heating and ventilation were investigated. Very compact heat pumps are developed in such a way that it will be possible to integrate these units into the window parapet or into a prefabricated timber façade.
EnerPHit-green concept Modernisation of a historic building with application of an aerogel insulation plaster
This demonstration project shows the comprehensive modernization of a historic building within the constraints of a regional protection zone. By using the Aerogel high-performance insulating plaster, a comprehensive energy-efficient building refurbishment had been realized without changing the outer appearance of the façade.