IEA Tasks & Annexe

There are 126 results.

Internationale Energieagentur (IEA)

IEA SHC Task 52: Solar Thermal & Energy Economics in Urban Environments

IEA SHC Task 52 focused on the analysis of the future role of solar thermal heat in integrated urban energy systems. The potential of solar thermal applications to cover the low-temperature heat demand in future low-carbon energy systems was investigated against the background of the rapidly changing framework conditions in the energy sector. Best practice examples for the integration of solar thermal systems into urban energy systems were evaluated and documented.

Internationale Energieagentur (IEA)

IEA EBC Annex 64: Optimised Performance of Energy Supply Systems with Exergy Principles (Working period 2014-2018)

To reduce CO2 emissions in cities, an overall understanding of energy conversion processes is necessary, which also takes temperature levels into account. This is particularly important when alternative heat sources such as waste heat, ambient heat, solar and geothermal energy are to be used, as these often have a low temperature level, i.e. a low exergy content. Accordingly, urban energy systems are analysed and optimised within the framework of the IEA EBC Annex 64 with the help of the exergy approach.

Internationale Energieagentur (IEA)

IEA Bioenergy Task 37: Energy from Biogas (Working Period 2019 - 2021)

Aim of Task 37 is to accelerate development and progress of biogas technology in the member countries. During the working period 2019-2021 the focus lies on the ecologically and economically sound implementation of biogas technology in agricultural and industrial processes.

Internationale Energieagentur (IEA)

IEA Wind Task 19: Wind Energy in Cold Climates (working period 2019 - 2021)

The project deals with the challenges of wind power utilisation in icing conditions and provides a strong opportunity to generate new knowledge by global networking. Energiewerkstatt leads a subtask in the field of icefall risk and works on deriving rules of thumb for the risk assessment of the ice throw risk of turbines in operation during icing conditions.

Internationale Energieagentur (IEA)

IEA Wind Task 32: Wind LiDAR Systems für Wind Energy Deployment (Working period 2019-2021)

IEA Wind Task 32 (since 2022: Task 52) deals with the challenges of using Wind-LiDAR-Systems and provides a strong opportunity to generate new knowledge by global networking. Energiewerkstatt elaborated in this phase of Task 32 an analysis regarding data availabilities of LiDAR measurement campaigns at different sites in Austria and resumed an organisational role regarding the assessment of uncertainties of LiDAR measurements in complex terrain.

Internationale Energieagentur (IEA)

IEA-4E Annex Electric Motor Systems (EMSA). (Working period 2014-2017)

The goal of the Annex Electric Motor Systems is to raise awareness on the large savings potential in motor systems, while showing the realization method of such a path. Currently, Austria leads the task Energy Audits for Motor Systems to develop recommendations for carrying out energy audits for motor systems based on international standards.

Internationale Energieagentur (IEA)

IEA SHC Task 51: Solar Energy in Urban Planning

The focus of IEA SHC Task 51 ‚Solar Energy in Urban Planning’ has been placed on the topic of solar energy integration in urban environment. Hereby, different international examples, options and processes for planning and implementation of solar energy measures in cities throughout the world have been screened, outlined and equipped with recommendations for further development. The core outcomes of the project address different options and possibilities for optimization of planning processes, framework conditions, tools, methods and education aiming to attain more effective and timely understanding as well as integration of solar energy in urban context.

Internationale Energieagentur (IEA)

IEA DSM Task 25 – Business Models for a more effective market uptake of DSM energy services

This task aims at the identification and development of effective business models for energy services, which lead to a sustainable growth of energy efficiency services. Therefore the various national framework conditions and contexts have been analysed, that are necessary for a successful development of such business models. Examples for start-ups and entrepreneurs have been discussed, their challenges and deficits as well as success factors in terms of capabilities/skills identified and out of these findings a web based analysis tool been developed.

Internationale Energieagentur (IEA)

IEA EBC Annex 61 - Business and Technical Concepts for Deep Energy Retrofit of Public Buildings

Target of IEA EBC Annex 61 was the development of technical and economical concepts for Deep Energy Retrofit of public buildings. To force high-quality and energy efficient retrofit, besides the enhancement and dissemination of innovative, technical retrofit concepts, the focus was in the development of innovative business models (energy-contracting).

Internationale Energieagentur (IEA)

IEA DSM Task 24: Behaviour Change in DSM – Helping the Behaviour Changers (Working period 2015-2017)

More than 20% of the use of energy for small consumers can be saved by changed behaviours. Past efforts to tap these potentials through DSM-interventions are not effective. The Task 24 dealt with the most important actors groups as well as tools, which support the behaviour changers in their daily work. In addition, an assessment method for DSM-interventions in the frame of the Austrian law on energy efficiency was elaborated.

Internationale Energieagentur (IEA)

Clean Energy Education & Empowerment (C3E International Initiative)

The C3E TCP deals with strategies, policies and measures to increase the promotion of women in the energy sector. The aim is to create a framework in which participating countries can share information and best practices on effective strategies for the empowerment of women in this sector.

Internationale Energieagentur (IEA)

IEA EBC Annex 60: New generation computational tools for building and community energy systems based on the Modelica and Functional Mockup Interface standards

The objective was to develop and demonstrate next-generation computational tools that allow building and community energy grids to be designed and operated as integrated systems. The work conducted in Annex 60 has helped to share, further develop and deploy free open-source contributions of previously uncoordinated activities in modeling and simulation, based on the Modelica and Functional Mockup Interface standards.

Internationale Energieagentur (IEA)

ISGAN Annex 7: Smart Grid Transitions – on Institutional Change

The International Smart Grid Action Network (ISGAN) aims at fostering the global implementation of Smart Grids. Annex 7 – Smart Grid Transitions deals with the related challenges regarding institutional change and socio-technical transition of the electricity systems.

Internationale Energieagentur (IEA)

IEA HPT Task 41: Cold Climate Heat Pumps

The aim was to increase the efficiency of outdoor air heat pumps in cold climates in locations with low outside temperatures of up to -25°C. Newly developed heat exchanger concepts were tested and optimized regarding their icing behaviour. Different circuit modifications were modelled and simulation studies for low ambient temperatures were carried out.

Internationale Energieagentur (IEA)

Mapping of IEA TCPs

The intention of this project was to visualize the current activities of the IEA Energy Technology Network and to identify possible gaps and overlaps. The mapping includes 185 ongoing tasks and annexes (Status September 2017).

Internationale Energieagentur (IEA)

IEA TCP Fluidized Bed Conversion (FBC). Working period 2013-2016

The Technology Collaboration Programme includes the collaboration, the exchange of relevant information and networking in the area of fluidized bed conversion of fuels applied for clean energy production.

Internationale Energieagentur (IEA)

IEA-DHC Annex TS2: Implementation of Low Temperature District Heating Systems

The potential of alternative heat sources is highest at low system temperatures, but current district heating networks are usually high-temperature systems. The aim of the IEA DHC Annex TS2 is to support the transformation of district heating networks towards lower temperatures (the so-called 4th generation). For this purpose, Annex TS2 forms an international platform that enables an exchange on the topics of technology, system, demonstration and competitiveness.

Internationale Energieagentur (IEA)

IEA SHC PVT Task 60: Applications of Photovoltaic/thermal (PVT) Systems and New Fields of Application and Examples of PVT

The international research collaboration IEA SHC Task 60 (Application of PVT Collectors) identified existing applications for PVT technologies and evaluated and highlighted potential system solutions where PVT technology has clear advantages over separate installation of PV modules and solar thermal collectors. In analogy, their advantages and current barriers for a broad market acceptance were highlighted.

Internationale Energieagentur (IEA)

IEA 4E: Annex Electric Motor Systems. Working period 2017 - 2019

The goal of the Annex Electric Motor Systems is to raise awareness on the large savings potential in motor systems, while showing the realization method of such a path. After publishing the „Policy Guidelines for Electric Motor Systems“ and recommendations for carrying out energy audits for motor systems based on international standards Austria analysed the impact of industrial automation on electricity consumption and the motor market.

Internationale Energieagentur (IEA)

IEA HPT Annex 51: Acoustic Signatures of Heat Pumps

The aim of the project was to increase the acceptance of heat pumps by reducing their noise emissions and vibrations and to reduce market barriers. Using innovative measurement and data analysis methods, influencing factors on the acoustic emissions of heat pump systems and the impact of acoustic protection measures were investigated. The results were prepared in the form of guidelines and recommendations for action.