Search Results

Haus der Zukunft

e80^3-Buildings - Sub project 1: Basics

Goal of this subproject was to select the building with the highest potential within a building-portfolio. Therefore a criteria catalogue was developed, which is generally applicable.

Haus der Zukunft

PHOTOVOLTAIC WATER Solution

Passive House refurbishment facade with integrated photovoltaic modules for direct, current-based warm water preheating. The GIWOG, an energy-conscious and environmentally and socially oriented client, intends to undertake an energy-related modernisation project, which will further optimise energy consumption to be more efficient at an apartment complex in Graz, main street 302-306. The goal is to lower the energy consumption for heating and hot water from the current level of approximately 135 kWh /m²a to approximately 8 kWh /m²a. The planned measures should correspond with an overall energy consumption reduction of approx. 94 %.

Haus der Zukunft

e-retrofit kit - tool kit for passive house retrofit

Development of an internet-based tool for passive house retrofit für - target group social housing companies. Actualization of tool after test and evaluation in case-studies. dissemination activities in austria.

Haus der Zukunft

Building of Tomorrow for the construction industry

Dissemination of results of the research initiative "Building of tomorrow" for two specific target groups - master builder and installer - implementation in further vocational training concepts

Haus der Zukunft

e80^3-Buildings - Sub project 4: Demonstration object

Alongside the realisation of the plus energy building in Kapfenberg, a demonstration project is scheduled to be created that accomplishes an economically viable and technically innovative solution for the future.

Haus der Zukunft

Refurbishment of a housing complex to passive-house standard, Graz - Dieselweg

Refurbishment of the former "Puch-Siedlung", built as a housing area for employees of the company "Puch", in Graz Liebenau, in the period from the 1950s to 1970s, as an exemplary model for a refurbishment in "passive house standard" with special thoughtfulness to the tenants. "From domestic fuel to solar self sufficiency"

Haus der Zukunft

e80^3-Buildings - Sub project 2: Concept development

Based on the selection of suitable demonstration projects in Subproject 1 an innovative concept for passive and active building envelopes and energy supply of so called "Plus Energy Buildings" (renovation) has been developed.

Haus der Zukunft

Catalogue of Passivhouse Details for Refurbishments

A Catalogue of Passivhouse Details for Refurbishments for buildings of all building periods from the 1870 to the 1980s. Special consideration to the refurbishment of building parts in contact with the earth. Integration of controlled ventilation services. Construction elements description with drawings, building physical data and ecological life cycle assessment. This project aimed at contributing to "Replicable refurbishment concepts for meeting passive house (or comparable) standard in buildings of all building periods".

Haus der Zukunft

Gründerzeit with future - subproject 6: dissemination

Dissemination aimed at defining the relevant target groups and broadly distributing the innovative solutions of the flagship project GdZ to the defined target groups. It is of crucial importance to effect a wide awareness level and to make a deep impact on the relevant target groups.

Haus der Zukunft

e80^3-Buildings - Sub project 5: Monitoring and dissemination

The content of subproject 5 was the analysis of energy- as well as building-biology-related issues for the evaluation and quality management of the demo-project in Kapfenberg, which involves a high-quality refurbishment to a plus energy house within the program "Haus der Zukunft - Building of Tomorrow". Within this process the user acceptance before, during and after the renovation was elevated and this will be processed for upcoming projects. The environmental quality of the building regarding the choice of materials and measures during the construction phase and the subsequent use of the building was assessed with the help of the TQB-planning and evaluation tool.

Haus der Zukunft

Kierling passive house - heading into the future sustainably

Using the example of demonstrational renovation, Kierling (built between 1977 and 1979) tests the possibilities of a renovation in passive house standard in technical, organizational and financial terms as an outstanding example of a comprehensive renovation.

Haus der Zukunft

THERM-opti-BALCONY: Thermal Optimized Renovation of Balconies

Pre-cast cantilever balconies represent a particular problem in the thermal renovation of buildings. The central goal of this project is the development of practical and cost-effective mounting solutions for the thermally decoupled reconstruction of balconies on building frontages and achieving a significant increase in the energy performance of the thermal renovation measure.

Haus der Zukunft

Gründerzeit with future - demonstration project 1: David´s Corner

High value energy efficient refurbishment of an ensemble of three neighbouring Wilhelminian style buildings in a non-lucrative location.

Haus der Zukunft

Serial refurbishment for buildings in timber construction

Refurbishment of single- and two-familiy houses in timber construction in Austria has a large CO2-saving potential. To meet the special requirements for the refurbishment of timber constructions, a concept for the renovation to passive house respectively plus-energy house standard with special focus on ecologic construction materials was developed in this project.

Haus der Zukunft

NEST international - New standards for old houses international

The main goal was to raise awareness for energetic renovations of settlement houses due to the handbook "Neue Standards für alte Häuser" in Slovakia and the Czech Republic. In doing so, the refurbishment potential has been identified in the target countries, experiences exchanged and information transferred. Contacts to the relevant target groups have been established.

Haus der Zukunft

BIGMODERN - Subproject 11: Dissemination of project results

The project is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups, such as decision makers inside the BIG Bundesimmobiliengesellschaft, various users of federal buildings and other real estate companies nationally and internationally.

Haus der Zukunft

WHISCERS. Whole House In-Situ Carbon & Emission Reduction Solution

Whiscers is a system for installing internal wall insulation with minimal mess, whilst the resident remains in the property. It involves measuring the walls in the property using a laser device that enables fast and highly accurate measurement. Information is then sent electronically to a computer controlled off-site cutting machine that is rapid, precise and mess-free.

Haus der Zukunft

BIGMODERN - Subproject 8: Demonstration building Amtshaus Bruck - Realisation

In the frame of the flagship project BIGMODERN the "Amtshaus Bruck an der Mur" had been renovated according to above-average quality standards concerning energy efficiency and sustainability while complying with an industrial management point of view.

Haus der Zukunft

IEA SHC Task 37: Advanced Housing Renovation with Solar & Conservation

Development of advanced renovation concepts for residential buildings. For the housing segments with the greatest energy saving potentials strategies for increased market penetration of advanced housing renovation are investigated. Analysing outstanding renovation projects shall lead to technically and economically robust and sustainable concepts for housing renovation.

Haus der Zukunft

Renovation of the "Gründerzeit" building Eberlgasse in passive house standard

Based on the latest available technical capabilities, the renovation of Eberlgasse 3 will show that passive house standard is achievable even in a typical 19th century building.